The invention discloses a construction method for a cast-in-place box girder to span an existing overpass, which comprises the following steps: step 1, a construction preparation stage, including treatment of a foundation, processing of a template and processing of reinforcing steel bars; secondly, an all-round scaffold is set up and reinforced, the scaffold is set up firstly, after the scaffold is set up, a bottom die and an outer side plate of the box girder are installed, then the scaffold is pre-pressed, after pre-pressing is completed and unloading is conducted, the elevation of the bottom die is adjusted according to the situation, and finally an inner side die and a top plate bottom die of the box girder are installed; 3, pouring of the box girder: after full-section pouring of the box girder, the box girder is maintained, tensioning is conducted when the concrete strength reaches 85% of the design strength, and finally grouting is conducted; and fourthly, the scaffold is dismantled. According to the method, the existing highway bridge is reinforced by the ring buckle type all-round scaffold, then the ring buckle type all-round scaffold is erected on the top of the existing highway bridge to serve as a cast-in-place scaffold, mounting and dismounting are convenient, and the construction period can be shortened.
本发明公开了一种现浇箱梁跨越既有立交桥施工方法,包括如下步骤:步骤一:施工准备阶段,包括地基的处理、模板的加工和钢筋的加工;步骤二:满堂脚手架的搭建和加固施工,首先搭设脚手架,在脚手架搭设完成后,安装箱梁的底模和外侧板,再对脚手架进行预压,预压完成卸载后,根据情况对底模标高进行调整,最后安装箱梁的内侧模和顶板底模;步骤三:箱梁的浇筑,全断面浇筑箱梁后,对箱梁进行养护,待待砼强度达到设计强度85%时张拉,最后进行压浆;步骤四:脚手架的拆除。本发明中盘扣式满堂脚手架加固既有公路桥梁,然后在既有公路桥梁顶部搭设盘扣式满堂脚手架作为现浇脚手架,安装和拆除均较方便,可以节约工期。
Construction method of cast-in-place box girder crossing existing overpass
The invention discloses a construction method for a cast-in-place box girder to span an existing overpass, which comprises the following steps: step 1, a construction preparation stage, including treatment of a foundation, processing of a template and processing of reinforcing steel bars; secondly, an all-round scaffold is set up and reinforced, the scaffold is set up firstly, after the scaffold is set up, a bottom die and an outer side plate of the box girder are installed, then the scaffold is pre-pressed, after pre-pressing is completed and unloading is conducted, the elevation of the bottom die is adjusted according to the situation, and finally an inner side die and a top plate bottom die of the box girder are installed; 3, pouring of the box girder: after full-section pouring of the box girder, the box girder is maintained, tensioning is conducted when the concrete strength reaches 85% of the design strength, and finally grouting is conducted; and fourthly, the scaffold is dismantled. According to the method, the existing highway bridge is reinforced by the ring buckle type all-round scaffold, then the ring buckle type all-round scaffold is erected on the top of the existing highway bridge to serve as a cast-in-place scaffold, mounting and dismounting are convenient, and the construction period can be shortened.
本发明公开了一种现浇箱梁跨越既有立交桥施工方法,包括如下步骤:步骤一:施工准备阶段,包括地基的处理、模板的加工和钢筋的加工;步骤二:满堂脚手架的搭建和加固施工,首先搭设脚手架,在脚手架搭设完成后,安装箱梁的底模和外侧板,再对脚手架进行预压,预压完成卸载后,根据情况对底模标高进行调整,最后安装箱梁的内侧模和顶板底模;步骤三:箱梁的浇筑,全断面浇筑箱梁后,对箱梁进行养护,待待砼强度达到设计强度85%时张拉,最后进行压浆;步骤四:脚手架的拆除。本发明中盘扣式满堂脚手架加固既有公路桥梁,然后在既有公路桥梁顶部搭设盘扣式满堂脚手架作为现浇脚手架,安装和拆除均较方便,可以节约工期。
Construction method of cast-in-place box girder crossing existing overpass
一种现浇箱梁跨越既有立交桥施工方法
XIE WENXIANG (author) / DAI DEYI (author) / ZHANG XIANZHE (author) / WU JIANHUA (author) / WANG SHUQI (author) / LEUNG CHUN YIP (author) / LIU YIFEI (author) / CHEN JIYAN (author) / FAN YUANPING (author) / YIN LUJUN (author)
2023-11-17
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Construction method of cast-in-place box girder crossing existing railway bridge
European Patent Office | 2023
|Construction method for pushing steel box girder to overpass existing expressway
European Patent Office | 2023
|Overpass existing line large-span large-section steel box girder and construction method
European Patent Office | 2024
|European Patent Office | 2023
|Overpass expressway steel box girder bridge construction method
European Patent Office | 2020
|