A platform for research: civil engineering, architecture and urbanism
Fabricated prefabricated slope protection device and construction method thereof
The invention discloses a fabricated prefabricated slope protection device and a construction method thereof. Slope protection blocks are formed through one-time pouring; at least one planting hole isformed in each slope protection block; clamping devices are arranged at the two sides of each slope protection block; the multiple slope protection blocks are connected through the clamping devices on the side faces; the ends of the multiple slope protection blocks are connected through transverse fixing frames; lug plates are arranged at the two ends of each slope protection block; the lug plates at the ends of every two adjacent slope protection blocks are connected with form a drainage groove; and single slope protection elements are connected through the clamping devices at the two sidesin a spliced mode. According to the fabricated prefabricated slope protection device and the construction method thereof, after assembly is completed, a continuous and complete three-dimensional structure is rapidly formed, a slope protection structure has excellent water permeability, ultrahigh strength, excellent durability, and the fabricated prefabricated slope protection device has a good greening effect and has good popularization value.
本发明提供一种装配式预制护坡装置及其施工方法,护坡块一次浇筑成型,护坡块上设有至少一个种植孔,护坡块两侧设有卡接装置,多个护坡块通过侧面的卡接装置连接,多个护坡块端部通过横向固定架连接,护坡块两端设有耳板,两个相邻的护坡块端部的耳板连接形成排水槽。个单体护坡构件由两侧卡接装置连拼装连接。拼装完成后迅速的形成连续、完整立体结构,具有极好的渗水性、超高强度、优异耐久性及良好的绿化作用的护坡,具有较好的推广价值。
Fabricated prefabricated slope protection device and construction method thereof
The invention discloses a fabricated prefabricated slope protection device and a construction method thereof. Slope protection blocks are formed through one-time pouring; at least one planting hole isformed in each slope protection block; clamping devices are arranged at the two sides of each slope protection block; the multiple slope protection blocks are connected through the clamping devices on the side faces; the ends of the multiple slope protection blocks are connected through transverse fixing frames; lug plates are arranged at the two ends of each slope protection block; the lug plates at the ends of every two adjacent slope protection blocks are connected with form a drainage groove; and single slope protection elements are connected through the clamping devices at the two sidesin a spliced mode. According to the fabricated prefabricated slope protection device and the construction method thereof, after assembly is completed, a continuous and complete three-dimensional structure is rapidly formed, a slope protection structure has excellent water permeability, ultrahigh strength, excellent durability, and the fabricated prefabricated slope protection device has a good greening effect and has good popularization value.
本发明提供一种装配式预制护坡装置及其施工方法,护坡块一次浇筑成型,护坡块上设有至少一个种植孔,护坡块两侧设有卡接装置,多个护坡块通过侧面的卡接装置连接,多个护坡块端部通过横向固定架连接,护坡块两端设有耳板,两个相邻的护坡块端部的耳板连接形成排水槽。个单体护坡构件由两侧卡接装置连拼装连接。拼装完成后迅速的形成连续、完整立体结构,具有极好的渗水性、超高强度、优异耐久性及良好的绿化作用的护坡,具有较好的推广价值。
Fabricated prefabricated slope protection device and construction method thereof
一种装配式预制护坡装置及其施工方法
ZHANG SHENGCHAO (author) / ZHANG TIANLONG (author) / WANG QI (author) / WU CHAOHUAN (author)
2021-03-12
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Prefabricated slope protection and construction method thereof
European Patent Office | 2023
|Prefabricated ecological protection slope and construction method thereof
European Patent Office | 2022
|Prefabricated ecological brick slope protection structure and construction method thereof
European Patent Office | 2024
|Prefabricated ecological brick slope protection structure and construction method thereof
European Patent Office | 2020
|Fabricated slope protection structure and construction method thereof
European Patent Office | 2022
|