Construction method of underground garage raft skip method
The invention discloses a construction method of an underground garage raft skip method, which comprises the following steps: laying a foundation layer at the soil of a construction position, binding reinforcing steel bars on the foundation layer, and preparing for pouring; a to-be-constructed position is divided into a plurality of construction areas, then each construction area is divided into a plurality of warehouse jumping areas and warehouse sealing areas, the warehouse jumping areas and the warehouse sealing areas are arranged at intervals, construction joints are division positions between the warehouse jumping areas and the warehouse sealing areas, and the construction joints are constructed; parallel pouring is carried out on the skip areas of all the construction areas at the same time, pouring is carried out on the sealing areas and bottom plates seven days or above after pouring is completed, and meanwhile outer walls and columns are poured in sequence; underground two-layer wall columns are arranged on the bottom plate, a mold is arranged, then operation is repeated, and an underground two-layer top plate is formed; and arranging underground first-layer wall columns on the underground second-layer top plate, arranging a mold, and then repeating the operation to form an underground first-layer top plate so as to complete top plate pouring.
本发明公开了一种地下车库筏板跳仓法的施工方法,包括:在施工位置土壤处铺设基础层,并在基础层上进行钢筋绑扎,准备浇筑;将待施工位置分为多个施工区,再将各个施工区分为多个跳仓区和封仓区,跳仓区和封仓区间隔设置,施工缝为跳仓区和封仓区的之间的分割位置,并对施工缝进行构造;对各个施工区的跳仓区同时平行浇筑,待浇筑完成后七天以上,对封仓区完成浇筑,完成底板浇筑,同时按顺序对外墙及柱进行浇筑;在底板上设置地下二层墙柱并设模,然后重复操作,形成地下二层顶板;在地下二层顶板上设置地下一层墙柱并设模,然后重复操作,在形成地下一层顶板,完成顶板浇筑。
Construction method of underground garage raft skip method
The invention discloses a construction method of an underground garage raft skip method, which comprises the following steps: laying a foundation layer at the soil of a construction position, binding reinforcing steel bars on the foundation layer, and preparing for pouring; a to-be-constructed position is divided into a plurality of construction areas, then each construction area is divided into a plurality of warehouse jumping areas and warehouse sealing areas, the warehouse jumping areas and the warehouse sealing areas are arranged at intervals, construction joints are division positions between the warehouse jumping areas and the warehouse sealing areas, and the construction joints are constructed; parallel pouring is carried out on the skip areas of all the construction areas at the same time, pouring is carried out on the sealing areas and bottom plates seven days or above after pouring is completed, and meanwhile outer walls and columns are poured in sequence; underground two-layer wall columns are arranged on the bottom plate, a mold is arranged, then operation is repeated, and an underground two-layer top plate is formed; and arranging underground first-layer wall columns on the underground second-layer top plate, arranging a mold, and then repeating the operation to form an underground first-layer top plate so as to complete top plate pouring.
本发明公开了一种地下车库筏板跳仓法的施工方法,包括:在施工位置土壤处铺设基础层,并在基础层上进行钢筋绑扎,准备浇筑;将待施工位置分为多个施工区,再将各个施工区分为多个跳仓区和封仓区,跳仓区和封仓区间隔设置,施工缝为跳仓区和封仓区的之间的分割位置,并对施工缝进行构造;对各个施工区的跳仓区同时平行浇筑,待浇筑完成后七天以上,对封仓区完成浇筑,完成底板浇筑,同时按顺序对外墙及柱进行浇筑;在底板上设置地下二层墙柱并设模,然后重复操作,形成地下二层顶板;在地下二层顶板上设置地下一层墙柱并设模,然后重复操作,在形成地下一层顶板,完成顶板浇筑。
Construction method of underground garage raft skip method
一种地下车库筏板跳仓法的施工方法
DONG YAPENG (author) / QI JIANMIN (author) / LIU HAILONG (author) / YANG BIN (author) / QI FUZHEN (author) / YANG XUELIANG (author) / LIU HONGYU (author) / SUN LIANG (author) / ZHU GUANGQIANG (author) / YANG JIAXU (author)
2023-11-17
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Waterproof method for staged construction of underground garage raft
European Patent Office | 2024
|