A platform for research: civil engineering, architecture and urbanism
Peacetime and wartime conversion wall
The invention relates to the field of civil air defense engineering, and discloses a peacetime and wartime conversion wall which comprises transverse limiting columns and a combined wallboard, the combined wallboard comprises 2n + 1 first plates and 2n second plates, n is a natural number larger than or equal to 1, every two first plates are arranged at intervals in the vertical direction, and each second plate makes contact with the two first plates; two insertion blocks are fixedly arranged on the surface of the second plate block, two insertion grooves are formed in the first plate block in a penetrating mode, and the insertion blocks and the insertion grooves are in insertion fit in the vertical direction; the transverse limiting columns are used for being connected with a wall body and/or a bearing column of a building, and the transverse limiting columns are arranged in the inserting grooves in the two ends of the combined wallboard respectively. By means of the design of the combined wallboard, waste of manpower in the carrying process is reduced, the carrying efficiency is improved, efficient operation of peacetime and wartime conversion related work is facilitated, supporting can be achieved by means of a building main body structure, a supporting face does not need to be found on the ground, and dependence on the ground flatness is reduced.
本申请涉及人防工程的领域,公开了一种平战转换墙,包括横向限位柱和组合式墙板,组合式墙板包括2n+1个第一板块和2n个第二板块,n为大于或等于1的自然数,第一板块沿竖直方向两两间隔设置,每个第二板块均与两个第一板块接触;第二板块表面固定设置有两个插块,第一板块上贯通开设有两个插槽,插块与插槽沿竖直方向插接配合;横向限位柱用于与建筑物的墙体和/或承重柱连接,组合式墙板两端的插槽中各设置有一个横向限位柱。本申请通过组合式墙板的设计减少了搬运过程对人力的浪费,提高了搬运效率,有利于平战转换相关工作的高效进行,并且能够借助建筑主体结构实现支撑,不需要在地面寻找支撑面,减少了对地面平整度的依赖。
Peacetime and wartime conversion wall
The invention relates to the field of civil air defense engineering, and discloses a peacetime and wartime conversion wall which comprises transverse limiting columns and a combined wallboard, the combined wallboard comprises 2n + 1 first plates and 2n second plates, n is a natural number larger than or equal to 1, every two first plates are arranged at intervals in the vertical direction, and each second plate makes contact with the two first plates; two insertion blocks are fixedly arranged on the surface of the second plate block, two insertion grooves are formed in the first plate block in a penetrating mode, and the insertion blocks and the insertion grooves are in insertion fit in the vertical direction; the transverse limiting columns are used for being connected with a wall body and/or a bearing column of a building, and the transverse limiting columns are arranged in the inserting grooves in the two ends of the combined wallboard respectively. By means of the design of the combined wallboard, waste of manpower in the carrying process is reduced, the carrying efficiency is improved, efficient operation of peacetime and wartime conversion related work is facilitated, supporting can be achieved by means of a building main body structure, a supporting face does not need to be found on the ground, and dependence on the ground flatness is reduced.
本申请涉及人防工程的领域,公开了一种平战转换墙,包括横向限位柱和组合式墙板,组合式墙板包括2n+1个第一板块和2n个第二板块,n为大于或等于1的自然数,第一板块沿竖直方向两两间隔设置,每个第二板块均与两个第一板块接触;第二板块表面固定设置有两个插块,第一板块上贯通开设有两个插槽,插块与插槽沿竖直方向插接配合;横向限位柱用于与建筑物的墙体和/或承重柱连接,组合式墙板两端的插槽中各设置有一个横向限位柱。本申请通过组合式墙板的设计减少了搬运过程对人力的浪费,提高了搬运效率,有利于平战转换相关工作的高效进行,并且能够借助建筑主体结构实现支撑,不需要在地面寻找支撑面,减少了对地面平整度的依赖。
Peacetime and wartime conversion wall
一种平战转换墙
ZHOU ZHUYONG (author) / ZHANG QIANG (author) / XU YU (author) / JI LING (author)
2023-11-17
Patent
Electronic Resource
Chinese
Peacetime car park to wartime hospital
British Library Online Contents | 2011
Wartime and peacetime housing construction
Engineering Index Backfile | 1944
|Peacetime to wartime : transitions in defense research policy at MIT
DSpace@MIT | 1982
|