A platform for research: civil engineering, architecture and urbanism
Early-dismantling formwork supporting system for ribbed floor system
The invention relates to a dense rib floor early-dismantling formwork supporting system. The supporting system comprises mold units arranged in an array mode and a supporting frame arranged on the mold units. Each mold unit comprises a longitudinal frame, a transverse frame and a movable mold shell; the front end of the longitudinal frame is provided with an insertion block and a splicing groove A; the rear end of the longitudinal frame is provided with an insertion groove and a second splicing groove. The inserting blocks are inserted into the inserting grooves; a first connecting hole and a second connecting hole are formed in the corresponding positions of the inserting groove and the inserting block respectively. The connecting hole A is correspondingly matched with the connecting hole B; the splicing groove A and the splicing groove B are respectively provided with a connecting hole C and a connecting hole D; a splicing groove C is formed in the bottom of the transverse frame; the splicing groove C is buckled with the splicing groove A and the splicing groove B; a connecting hole V correspondingly matched with the connecting hole C and the connecting hole D is formed in the splicing groove C; the edge of the movable formwork is connected with the tops of the longitudinal frame and the transverse frame; the supporting frame is connected with the mold unit. The supporting system can be adaptively combined according to design requirements on a construction site, the circulation is enhanced, and the application range is wide.
本发明涉及一种密肋楼盖早拆模板支撑体系;该支撑体系包括阵列布置的模具单元以及设置在模具单元的支撑架;模具单元包括纵边框、横边框、活动模壳;纵边框前端设有插块和拼接槽甲;纵边框后端设有插槽和拼接槽乙;插块插入插槽内;插槽与插块相对应位置分别设有连接孔甲、连接孔乙;连接孔甲、连接孔乙对应匹配;拼接槽甲、拼接槽乙分别设有连接孔丙、连接孔丁;横边框底部设有拼接槽丙;拼接槽丙与拼接槽甲、拼接槽乙扣合;拼接槽丙内设有与连接孔丙、连接孔丁对应匹配的连接孔戊;活动模壳倒扣,边沿与纵边框、横边框顶部相接;支撑架与模具单元相接。本发明的支撑体系在施工现场可根据设计要求进行适应性的组合,流转形增强,适用范围广。
Early-dismantling formwork supporting system for ribbed floor system
The invention relates to a dense rib floor early-dismantling formwork supporting system. The supporting system comprises mold units arranged in an array mode and a supporting frame arranged on the mold units. Each mold unit comprises a longitudinal frame, a transverse frame and a movable mold shell; the front end of the longitudinal frame is provided with an insertion block and a splicing groove A; the rear end of the longitudinal frame is provided with an insertion groove and a second splicing groove. The inserting blocks are inserted into the inserting grooves; a first connecting hole and a second connecting hole are formed in the corresponding positions of the inserting groove and the inserting block respectively. The connecting hole A is correspondingly matched with the connecting hole B; the splicing groove A and the splicing groove B are respectively provided with a connecting hole C and a connecting hole D; a splicing groove C is formed in the bottom of the transverse frame; the splicing groove C is buckled with the splicing groove A and the splicing groove B; a connecting hole V correspondingly matched with the connecting hole C and the connecting hole D is formed in the splicing groove C; the edge of the movable formwork is connected with the tops of the longitudinal frame and the transverse frame; the supporting frame is connected with the mold unit. The supporting system can be adaptively combined according to design requirements on a construction site, the circulation is enhanced, and the application range is wide.
本发明涉及一种密肋楼盖早拆模板支撑体系;该支撑体系包括阵列布置的模具单元以及设置在模具单元的支撑架;模具单元包括纵边框、横边框、活动模壳;纵边框前端设有插块和拼接槽甲;纵边框后端设有插槽和拼接槽乙;插块插入插槽内;插槽与插块相对应位置分别设有连接孔甲、连接孔乙;连接孔甲、连接孔乙对应匹配;拼接槽甲、拼接槽乙分别设有连接孔丙、连接孔丁;横边框底部设有拼接槽丙;拼接槽丙与拼接槽甲、拼接槽乙扣合;拼接槽丙内设有与连接孔丙、连接孔丁对应匹配的连接孔戊;活动模壳倒扣,边沿与纵边框、横边框顶部相接;支撑架与模具单元相接。本发明的支撑体系在施工现场可根据设计要求进行适应性的组合,流转形增强,适用范围广。
Early-dismantling formwork supporting system for ribbed floor system
密肋楼盖早拆模板支撑体系
GUO CHAO (author) / ZHOU ZHIJUN (author) / LEE HOON (author) / SUN JUCHAO (author) / HUANG JIE (author) / WANG ZHENGBIN (author) / ZHANG ZHENG (author) / WANG HUI (author) / WANG YITING (author) / SUN XIANGWU (author)
2023-11-17
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2023
|