A platform for research: civil engineering, architecture and urbanism
Early-dismantling formwork supporting system
The invention discloses an early-dismantling formwork supporting system. The system comprises a top plate formwork supporting system and a beam formwork supporting system. The top plate formwork supporting system comprises a plurality of top plate formworks; a plate strip is arranged between every two adjacent top plate formworks; the bottom of each top plate formwork is connected with a first batten which is horizontally arranged; the first battens are connected with second battens which are horizontally arranged; the first battens are perpendicular to the second battens; early-dismantling heads are arranged at the bottoms of the plate strips; and the bottom ends of the early-dismantling heads are connected with the top ends of early-dismantling supports. According to the early-dismantling formwork supporting system, supporting points are added, so that the stability of the formwork supporting system is guaranteed, supporting and dismantling are fast, the intermediate stacking link ofturnover materials is avoided, material turnover is accelerated, and then consumables and investment cost are reduced.
本发明公开了一种早拆模板支撑体系,包括顶板模板支撑体系和梁模板支撑体系;所述顶板模板支撑体系包括多个顶板模板,相邻两个所述顶板模板之间设有板带,所述顶板模板的底部与水平设置的木方一连接,所述木方一与水平设置的木方二连接,所述木方一与木方二垂直,所述板带的底部设有早拆头,所述早拆头的底端与早拆支撑的顶端连接。本发明的早拆模板支撑体系通过增加支撑点,从而保证模板支撑体系的稳定性,并且支拆快捷,避免了周转材料的中间堆放环节,加快了材料周转,进而降低耗材,减少投入成本。
Early-dismantling formwork supporting system
The invention discloses an early-dismantling formwork supporting system. The system comprises a top plate formwork supporting system and a beam formwork supporting system. The top plate formwork supporting system comprises a plurality of top plate formworks; a plate strip is arranged between every two adjacent top plate formworks; the bottom of each top plate formwork is connected with a first batten which is horizontally arranged; the first battens are connected with second battens which are horizontally arranged; the first battens are perpendicular to the second battens; early-dismantling heads are arranged at the bottoms of the plate strips; and the bottom ends of the early-dismantling heads are connected with the top ends of early-dismantling supports. According to the early-dismantling formwork supporting system, supporting points are added, so that the stability of the formwork supporting system is guaranteed, supporting and dismantling are fast, the intermediate stacking link ofturnover materials is avoided, material turnover is accelerated, and then consumables and investment cost are reduced.
本发明公开了一种早拆模板支撑体系,包括顶板模板支撑体系和梁模板支撑体系;所述顶板模板支撑体系包括多个顶板模板,相邻两个所述顶板模板之间设有板带,所述顶板模板的底部与水平设置的木方一连接,所述木方一与水平设置的木方二连接,所述木方一与木方二垂直,所述板带的底部设有早拆头,所述早拆头的底端与早拆支撑的顶端连接。本发明的早拆模板支撑体系通过增加支撑点,从而保证模板支撑体系的稳定性,并且支拆快捷,避免了周转材料的中间堆放环节,加快了材料周转,进而降低耗材,减少投入成本。
Early-dismantling formwork supporting system
一种早拆模板支撑体系
YANG JINLONG (author) / TIAN JINCHENG (author) / ZHAO YUJIANG (author) / ZHAO ZONGBO (author) / CHEN YANWEN (author) / ZHANG XINGWANG (author)
2020-12-29
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2023
|European Patent Office | 2022
|Early-dismantling formwork supporting system for ribbed floor system
European Patent Office | 2023
|