Construction method of ultra-large storage tank
The invention provides a construction method of an ultra-large storage tank, and relates to the technical field of construction methods. The construction method of the ultra-large storage tank specifically comprises the following steps of S1, mold manufacturing, S2, tower bottom and tower body assembling, S3, accessory mounting and S4, quality inspection. According to the method, after a mold is preset and built, an outer tank is assembled, welded and spliced, a field vertical field winding machine is used for controlling the composite motion of rotation of a core mold and up-down movement of a trolley, fibers soaked with resin are evenly distributed on a product lining according to a rule, and a synchronous belt for winding and driving the trolley to move up and down is designed to run in a vertical frame square pipe. The mold beams are detachable, compact in structure, safe, reliable and convenient and fast to wind and install on site, meanwhile, the mold beams are sequentially hung on a foundation in a hoisting and splicing mode, construction danger is greatly reduced, a large amount of time is saved, labor intensity is reduced, mechanical scratches are avoided, and construction quality, progress and safety are guaranteed.
本发明提供一种超大型储罐施工方法,涉及施工方法技术领域。该超大型储罐施工方法,具体包括以下步骤:S1.模具制作、S2.塔底与塔体组装、S3.附件安装、S4.质检。该方法采用模具的预设搭建后进行外罐组焊拼接,通过利用现场立式现场缠绕机控制芯模旋转与小车上下移动的复合运动,把浸透树脂的纤维按规律均匀布满在产品内衬上,缠绕传动小车上下运行的同步带是设计在立架方管内运行的,且模具梁可拆式,既结构紧凑、安全可靠,现场缠绕安装时又方便快捷,同时利用吊装拼接方式依次吊放在基础上,大大降低了施工的危险性,节约了大量时间,降低了劳动强度,避免了机械划伤,保证了施工质量、进度和安全。
Construction method of ultra-large storage tank
The invention provides a construction method of an ultra-large storage tank, and relates to the technical field of construction methods. The construction method of the ultra-large storage tank specifically comprises the following steps of S1, mold manufacturing, S2, tower bottom and tower body assembling, S3, accessory mounting and S4, quality inspection. According to the method, after a mold is preset and built, an outer tank is assembled, welded and spliced, a field vertical field winding machine is used for controlling the composite motion of rotation of a core mold and up-down movement of a trolley, fibers soaked with resin are evenly distributed on a product lining according to a rule, and a synchronous belt for winding and driving the trolley to move up and down is designed to run in a vertical frame square pipe. The mold beams are detachable, compact in structure, safe, reliable and convenient and fast to wind and install on site, meanwhile, the mold beams are sequentially hung on a foundation in a hoisting and splicing mode, construction danger is greatly reduced, a large amount of time is saved, labor intensity is reduced, mechanical scratches are avoided, and construction quality, progress and safety are guaranteed.
本发明提供一种超大型储罐施工方法,涉及施工方法技术领域。该超大型储罐施工方法,具体包括以下步骤:S1.模具制作、S2.塔底与塔体组装、S3.附件安装、S4.质检。该方法采用模具的预设搭建后进行外罐组焊拼接,通过利用现场立式现场缠绕机控制芯模旋转与小车上下移动的复合运动,把浸透树脂的纤维按规律均匀布满在产品内衬上,缠绕传动小车上下运行的同步带是设计在立架方管内运行的,且模具梁可拆式,既结构紧凑、安全可靠,现场缠绕安装时又方便快捷,同时利用吊装拼接方式依次吊放在基础上,大大降低了施工的危险性,节约了大量时间,降低了劳动强度,避免了机械划伤,保证了施工质量、进度和安全。
Construction method of ultra-large storage tank
一种超大型储罐施工方法
ZHANG XIUCHENG (author) / ZHOU YONGSHENG (author)
2023-11-17
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
B32B
LAYERED PRODUCTS, i.e. PRODUCTS BUILT-UP OF STRATA OF FLAT OR NON-FLAT, e.g. CELLULAR OR HONEYCOMB, FORM
,
Schichtkörper, d.h. aus Ebenen oder gewölbten Schichten, z.B. mit zell- oder wabenförmiger Form, aufgebaute Erzeugnisse
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Large storage tank ceramic backing welding construction method
European Patent Office | 2021
|