Point-supported glass curtain wall installation construction technology
The invention discloses a point-supported glass curtain wall installation and construction technology, relates to the technical field of glass curtain wall installation and construction, and aims to solve the problems that when an existing point-supported glass curtain wall is installed and constructed, auxiliary supporting installation is carried out through an embedded part and a glass auxiliary plate; once the glass curtain wall is fixed, the strength of the glass curtain wall needing to be installed is inconvenient to adjust, so that the stability of the glass curtain wall is influenced. The method comprises the following steps: firstly, paying off, connecting each pair of horizontal control points by using a stay wire by taking a determined control point as a reference, forming a net surface in the air by using the connected stay wire, marking each cross point by using a pen so as to ensure that the cross point of the stay wire is unchanged in the construction process, and then positioning, mounting and detecting an inhaul cable and a suspension rod; and then the inhaul cables are installed according to the principle that the inhaul cables are installed from top to bottom and from top to bottom and from top to bottom, the vertical inhaul cables are installed, the inhaul cables are in a free state from the top structure according to the length of the inhaul cables designed in a drawing plus 1-3 mm, and adjustment is conducted after installation of all the vertical inhaul cables is completed.
本发明公开了一种点支式玻璃幕墙安装施工工艺,涉及玻璃幕墙安装施工技术领域,为解决现有点支式玻璃幕墙在进行安装施工时依靠预埋件和玻璃助板进行辅助支撑安装,其一旦在固定之后不方便对所需要安装的玻璃幕墙的强度进行调整,从而影响其稳定性的问题。首先放线以确定好的控制点为基准将每对水平控制点用拉线连接,连接后的拉线在空中形成网面,用笔将每个交叉点作上标记以确保在施工过程中拉线的交叉点不变,然后拉索及悬空杆的定位、安装与检测;然后进行拉索的安装,安装按先上后下,先竖后横的原则进行安装,竖向拉索的安装,根据图纸设计的拉索长度加1mm‑3mm从顶部结构开始拉索呈自由状态,待全部竖向拉索安装结束后进行调整。
Point-supported glass curtain wall installation construction technology
The invention discloses a point-supported glass curtain wall installation and construction technology, relates to the technical field of glass curtain wall installation and construction, and aims to solve the problems that when an existing point-supported glass curtain wall is installed and constructed, auxiliary supporting installation is carried out through an embedded part and a glass auxiliary plate; once the glass curtain wall is fixed, the strength of the glass curtain wall needing to be installed is inconvenient to adjust, so that the stability of the glass curtain wall is influenced. The method comprises the following steps: firstly, paying off, connecting each pair of horizontal control points by using a stay wire by taking a determined control point as a reference, forming a net surface in the air by using the connected stay wire, marking each cross point by using a pen so as to ensure that the cross point of the stay wire is unchanged in the construction process, and then positioning, mounting and detecting an inhaul cable and a suspension rod; and then the inhaul cables are installed according to the principle that the inhaul cables are installed from top to bottom and from top to bottom and from top to bottom, the vertical inhaul cables are installed, the inhaul cables are in a free state from the top structure according to the length of the inhaul cables designed in a drawing plus 1-3 mm, and adjustment is conducted after installation of all the vertical inhaul cables is completed.
本发明公开了一种点支式玻璃幕墙安装施工工艺,涉及玻璃幕墙安装施工技术领域,为解决现有点支式玻璃幕墙在进行安装施工时依靠预埋件和玻璃助板进行辅助支撑安装,其一旦在固定之后不方便对所需要安装的玻璃幕墙的强度进行调整,从而影响其稳定性的问题。首先放线以确定好的控制点为基准将每对水平控制点用拉线连接,连接后的拉线在空中形成网面,用笔将每个交叉点作上标记以确保在施工过程中拉线的交叉点不变,然后拉索及悬空杆的定位、安装与检测;然后进行拉索的安装,安装按先上后下,先竖后横的原则进行安装,竖向拉索的安装,根据图纸设计的拉索长度加1mm‑3mm从顶部结构开始拉索呈自由状态,待全部竖向拉索安装结束后进行调整。
Point-supported glass curtain wall installation construction technology
一种点支式玻璃幕墙安装施工工艺
JU YUNFENG (author) / ZHOU RENJIE (author) / ZOU MING (author) / XU XIAMIN (author) / PAN YONGJIA (author)