A platform for research: civil engineering, architecture and urbanism
Building engineering construction fence
The invention discloses a building engineering construction fence, and relates to the technical field of construction fences, the building engineering construction fence comprises stand columns, a fence body is arranged between every two adjacent stand columns, the fence body is composed of two fence bases and L-shaped protection frames arranged at the upper ends of the fence bases, and a fixing plate is fixedly arranged on one side of the middle of each fence base; the construction fence comprises a left fixing plate and a right fixing plate, the two fixing plates are attached to each other, and an adjusting assembly used for adjusting the opening distance of the two fixing plates is arranged in the middle of the fixing plate on the left side. Therefore, adjustment can be conducted in time according to the set distance between every two adjacent stand columns on site, the variable-length installation mode can well adjust measures to local conditions, normal on-site construction can be guaranteed under the condition that the original protection effect is not damaged, and the defects caused when a traditional construction fence is integrally installed are overcome.
本发明公开了一种建筑工程施工围栏,涉及施工围栏技术领域,包括立柱,相邻两个立柱之间设有围栏本体,所述围栏本体由两个围栏底座和设置在围栏底座上端的L型护框构成,所述围栏底座的中部一侧固定设有固定板,两个固定板相互贴合设置,左侧所述固定板的中部设有用于调节两个固定板打开距离的调节组件,本发明中,通过将施工围栏整体变为左右两个组合式的设置,能够使得施工围栏的防护长度进行改变,从而可以根据现场相邻两根立柱的设置间距及时进行调整,这种可变长度的安装方式能够很好的因地制宜,在不破坏原有的防护效果的情况下还能保证现场施工的正常进行,解决了传统施工围栏一体化在安装时带来的弊端。
Building engineering construction fence
The invention discloses a building engineering construction fence, and relates to the technical field of construction fences, the building engineering construction fence comprises stand columns, a fence body is arranged between every two adjacent stand columns, the fence body is composed of two fence bases and L-shaped protection frames arranged at the upper ends of the fence bases, and a fixing plate is fixedly arranged on one side of the middle of each fence base; the construction fence comprises a left fixing plate and a right fixing plate, the two fixing plates are attached to each other, and an adjusting assembly used for adjusting the opening distance of the two fixing plates is arranged in the middle of the fixing plate on the left side. Therefore, adjustment can be conducted in time according to the set distance between every two adjacent stand columns on site, the variable-length installation mode can well adjust measures to local conditions, normal on-site construction can be guaranteed under the condition that the original protection effect is not damaged, and the defects caused when a traditional construction fence is integrally installed are overcome.
本发明公开了一种建筑工程施工围栏,涉及施工围栏技术领域,包括立柱,相邻两个立柱之间设有围栏本体,所述围栏本体由两个围栏底座和设置在围栏底座上端的L型护框构成,所述围栏底座的中部一侧固定设有固定板,两个固定板相互贴合设置,左侧所述固定板的中部设有用于调节两个固定板打开距离的调节组件,本发明中,通过将施工围栏整体变为左右两个组合式的设置,能够使得施工围栏的防护长度进行改变,从而可以根据现场相邻两根立柱的设置间距及时进行调整,这种可变长度的安装方式能够很好的因地制宜,在不破坏原有的防护效果的情况下还能保证现场施工的正常进行,解决了传统施工围栏一体化在安装时带来的弊端。
Building engineering construction fence
一种建筑工程施工围栏
CHEN YUANGUO (author) / LUO JINXIANG (author) / CHEN MEIRONG (author) / LYU CHUANQIN (author) / HE WENMING (author)
2023-11-21
Patent
Electronic Resource
Chinese
Dustproof building fence for civil engineering construction
European Patent Office | 2024
|