A platform for research: civil engineering, architecture and urbanism
Adjustable cofferdam structure and cofferdam construction method
The invention provides an adjustable cofferdam structure and a cofferdam construction method. The cofferdam structure comprises two pile foundations and diagonal bracings arranged between the two pile foundations. The length of each pile foundation is adjustable; the pile foundations are used for being inserted into a foundation to fix the cofferdam structure and are pulled and adjusted to a preset length according to soil texture; the diagonal bracings are fixedly connected between the two pile foundations, the lengths of the diagonal bracings are adjustable, and the diagonal bracings are fixedly connected with the pile foundations through enclosing purlins; and a cofferdam filling area is formed between every two adjacent pile foundations. According to the adjustable cofferdam structure and the cofferdam construction method, the length and the width of the cofferdam structure can be adjusted so that the cofferdam structure can adapt to various geological conditions, various engineering requirements can be met, and the universality of the cofferdam is improved.
本申请提供一种可调节的围堰结构及围堰施工方法。所述围堰结构包括2个桩基和设于2个桩基之间的对撑。每个所述桩基的长度可调节;所述桩基用于插设于地基中,将围堰结构进行固定,并根据土质抽拉调节至预定长度;所述对撑固定连接于2个所述桩基之间,所述对撑的长度可调节,所述对撑与所述桩基之间通过围檩固定连接;在相邻两个桩基之间形成围堰填土区。本申请提供了一种可调节的围堰结构及围堰施工方法,围堰结构的长度及宽度均可以调节,以适应多种地质情况,满足多种工程需求,增加围堰的通用性。
Adjustable cofferdam structure and cofferdam construction method
The invention provides an adjustable cofferdam structure and a cofferdam construction method. The cofferdam structure comprises two pile foundations and diagonal bracings arranged between the two pile foundations. The length of each pile foundation is adjustable; the pile foundations are used for being inserted into a foundation to fix the cofferdam structure and are pulled and adjusted to a preset length according to soil texture; the diagonal bracings are fixedly connected between the two pile foundations, the lengths of the diagonal bracings are adjustable, and the diagonal bracings are fixedly connected with the pile foundations through enclosing purlins; and a cofferdam filling area is formed between every two adjacent pile foundations. According to the adjustable cofferdam structure and the cofferdam construction method, the length and the width of the cofferdam structure can be adjusted so that the cofferdam structure can adapt to various geological conditions, various engineering requirements can be met, and the universality of the cofferdam is improved.
本申请提供一种可调节的围堰结构及围堰施工方法。所述围堰结构包括2个桩基和设于2个桩基之间的对撑。每个所述桩基的长度可调节;所述桩基用于插设于地基中,将围堰结构进行固定,并根据土质抽拉调节至预定长度;所述对撑固定连接于2个所述桩基之间,所述对撑的长度可调节,所述对撑与所述桩基之间通过围檩固定连接;在相邻两个桩基之间形成围堰填土区。本申请提供了一种可调节的围堰结构及围堰施工方法,围堰结构的长度及宽度均可以调节,以适应多种地质情况,满足多种工程需求,增加围堰的通用性。
Adjustable cofferdam structure and cofferdam construction method
一种可调节的围堰结构及围堰施工方法
WANG ZHENKUN (author)
2023-11-24
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Fabricated cofferdam structure and cofferdam construction method
European Patent Office | 2023
|CONSTRUCTION METHOD FOR COFFERDAM STRUCTURE AND COFFERDAM STRUCTURE
European Patent Office | 2022
|TEMPORARY COFFERDAM METHOD, TEMPORARY COFFERDAM STRUCTURE
European Patent Office | 2022
|Wall protection structure of cofferdam, cofferdam and construction method
European Patent Office | 2024
|