Construction method of full-fabricated frame structure
The invention provides a construction method of a full-fabricated frame structure, and relates to the technical field of building construction.The construction method of the full-fabricated frame structure comprises the steps that prefabricated parts are included; constructing a foundation; mounting a lower-layer prefabricated column; mounting upper-layer prefabricated columns; mounting the precast beam; mounting the prefabricated floor slab; and mounting the prefabricated wall. The high-strength bolts are installed by reserving the through holes in the prefabricated columns, and then the prefabricated beams provided with the end plate assemblies are installed. In addition, the other prefabricated beam fixedly provided with the end plate assembly can be selected to be installed at the other end of the high-strength bolt or one second end plate can be selected to be installed so that one independent prefabricated beam can be installed, and therefore constructors can conveniently install the prefabricated beams; and due to the semi-rigid connection performance between the prefabricated beams and the prefabricated columns, the whole frame has good ductility and energy dissipation capacity, and the purposes of facilitating installation and construction, saving energy and protecting the environment are achieved.
本发明提供一种全装配式框架结构施工方法,涉及建筑施工技术领域,该全装配式框架结构施工方法,包括:预制构件;基础的施工;下层预制柱的安装;上层预制柱的安装;预制梁的安装;预制楼板的安装;预制墙的安装。通过在预制柱的内部预留通孔对高强螺栓进行安装,进而对安装有端板组件的预制梁进行安装,而且能够根据实际情况在高强螺栓的另一端选择固定安装有端板组件的另一个预制梁进行安装或者选择一个第二端板进行安装以对单独的一个预制梁进行安装,不仅能够方便施工人员对预制梁进行安装,而且预制梁与预制柱之间的半刚性连接性能使框架整体具有较好的延性及耗能能力,达到了便于安装施工和节能环保的目的。
Construction method of full-fabricated frame structure
The invention provides a construction method of a full-fabricated frame structure, and relates to the technical field of building construction.The construction method of the full-fabricated frame structure comprises the steps that prefabricated parts are included; constructing a foundation; mounting a lower-layer prefabricated column; mounting upper-layer prefabricated columns; mounting the precast beam; mounting the prefabricated floor slab; and mounting the prefabricated wall. The high-strength bolts are installed by reserving the through holes in the prefabricated columns, and then the prefabricated beams provided with the end plate assemblies are installed. In addition, the other prefabricated beam fixedly provided with the end plate assembly can be selected to be installed at the other end of the high-strength bolt or one second end plate can be selected to be installed so that one independent prefabricated beam can be installed, and therefore constructors can conveniently install the prefabricated beams; and due to the semi-rigid connection performance between the prefabricated beams and the prefabricated columns, the whole frame has good ductility and energy dissipation capacity, and the purposes of facilitating installation and construction, saving energy and protecting the environment are achieved.
本发明提供一种全装配式框架结构施工方法,涉及建筑施工技术领域,该全装配式框架结构施工方法,包括:预制构件;基础的施工;下层预制柱的安装;上层预制柱的安装;预制梁的安装;预制楼板的安装;预制墙的安装。通过在预制柱的内部预留通孔对高强螺栓进行安装,进而对安装有端板组件的预制梁进行安装,而且能够根据实际情况在高强螺栓的另一端选择固定安装有端板组件的另一个预制梁进行安装或者选择一个第二端板进行安装以对单独的一个预制梁进行安装,不仅能够方便施工人员对预制梁进行安装,而且预制梁与预制柱之间的半刚性连接性能使框架整体具有较好的延性及耗能能力,达到了便于安装施工和节能环保的目的。
Construction method of full-fabricated frame structure
一种全装配式框架结构施工方法
ZHU LIPING (author) / LU WANQING (author) / TIAN WEI (author) / LI JIANJIE (author) / ZHU DAHAI (author) / LIU BIN (author) / SHI SHENGYAN (author)
2023-11-24
Patent
Electronic Resource
Chinese
Construction method for beam-column joint of full-fabricated prestressed concrete frame structure
European Patent Office | 2024
|Rapid construction method for fabricated frame structure
European Patent Office | 2023
|Fabricated frame structure and construction method thereof
European Patent Office | 2024
|Fabricated building frame structure and construction method
European Patent Office | 2024
|