A platform for research: civil engineering, architecture and urbanism
Outdoor corridor and automobile ramp dismantling process
The invention discloses an outdoor corridor and automobile ramp dismantling process. The process comprises the following steps that an automobile ramp section anti-collision wall is dismantled; the automobile ramp section supporting plate is dismantled; the automobile ramp section supporting columns are dismantled; an automobile ramp section bearing platform is dismantled; the automobile ramp section pile foundation is dismantled; the anti-collision wall of the outdoor corridor section is dismantled; an unloading support is erected, and an outdoor corridor section supporting plate is dismantled; the outdoor corridor section supporting columns are dismantled; an outdoor corridor section bearing platform is dismantled; the pile foundation of the outdoor corridor section is dismantled; the automobile ramp and the outdoor corridor are dismounted separately, and the dismounting steps are refined, so that the dismounting scheme is high in reliability, high in efficiency, low in noise and small in environmental influence, and the normative requirements of the building industry are met; the unloading supporting device is arranged, the supporting plate is cut along the connecting line between the two L-shaped rods, the cut supporting plate can be left on the stress platform and cannot fall to the ground, the danger of constructors is reduced, meanwhile, noise is reduced, and the influence on the environment is small.
一种室外连廊及汽车坡道拆除工艺,包括以下步骤:汽车坡道段防撞墙拆除;汽车坡道段支撑板拆除;汽车坡道段支撑柱拆除;汽车坡道段承台拆除;汽车坡道段桩基拆除;室外连廊段防撞墙拆除;搭设卸荷支撑,对室外连廊段支撑板进行拆除;室外连廊段支撑柱拆除;室外连廊段承台拆除;室外连廊段桩基拆除;通过将汽车坡道与室外连廊分开拆除,并精细化拆除步骤,使得拆除方案可靠性高、效率高、噪声小、环境影响小,符合建筑行业的规范性要求;通过设置卸荷支撑装置,沿着两个L型杆之间的连线对支撑板进行切割,可以使切割后的支撑板留在受力平台上而不会坠落至地面,降低了施工人员的危险,同时减小了噪声,对环境的影响较小。
Outdoor corridor and automobile ramp dismantling process
The invention discloses an outdoor corridor and automobile ramp dismantling process. The process comprises the following steps that an automobile ramp section anti-collision wall is dismantled; the automobile ramp section supporting plate is dismantled; the automobile ramp section supporting columns are dismantled; an automobile ramp section bearing platform is dismantled; the automobile ramp section pile foundation is dismantled; the anti-collision wall of the outdoor corridor section is dismantled; an unloading support is erected, and an outdoor corridor section supporting plate is dismantled; the outdoor corridor section supporting columns are dismantled; an outdoor corridor section bearing platform is dismantled; the pile foundation of the outdoor corridor section is dismantled; the automobile ramp and the outdoor corridor are dismounted separately, and the dismounting steps are refined, so that the dismounting scheme is high in reliability, high in efficiency, low in noise and small in environmental influence, and the normative requirements of the building industry are met; the unloading supporting device is arranged, the supporting plate is cut along the connecting line between the two L-shaped rods, the cut supporting plate can be left on the stress platform and cannot fall to the ground, the danger of constructors is reduced, meanwhile, noise is reduced, and the influence on the environment is small.
一种室外连廊及汽车坡道拆除工艺,包括以下步骤:汽车坡道段防撞墙拆除;汽车坡道段支撑板拆除;汽车坡道段支撑柱拆除;汽车坡道段承台拆除;汽车坡道段桩基拆除;室外连廊段防撞墙拆除;搭设卸荷支撑,对室外连廊段支撑板进行拆除;室外连廊段支撑柱拆除;室外连廊段承台拆除;室外连廊段桩基拆除;通过将汽车坡道与室外连廊分开拆除,并精细化拆除步骤,使得拆除方案可靠性高、效率高、噪声小、环境影响小,符合建筑行业的规范性要求;通过设置卸荷支撑装置,沿着两个L型杆之间的连线对支撑板进行切割,可以使切割后的支撑板留在受力平台上而不会坠落至地面,降低了施工人员的危险,同时减小了噪声,对环境的影响较小。
Outdoor corridor and automobile ramp dismantling process
一种室外连廊及汽车坡道拆除工艺
WEN ZHE (author) / CHEN CHEN (author) / YAN XUTONG (author) / MA XIAOBAO (author) / MENG YANG (author) / LOU XIYAN (author) / WANG MINGTAO (author) / CHEN WENTAO (author) / ZHENG SHUAI (author) / ZHANG XIAOPEI (author)
2023-11-24
Patent
Electronic Resource
Chinese
Automobile ramp dismantling construction method and lifting assembly framework and method thereof
European Patent Office | 2023
|Ramp Metering Strategies in a Corridor Network
British Library Conference Proceedings | 2009
|Construction method for dismantling non-solid box girder of ramp
European Patent Office | 2024
|Passenger transport hub ramp dismantling system and construction method thereof
European Patent Office | 2024
|