A platform for research: civil engineering, architecture and urbanism
Column straining beam integrated construction system
The invention relates to the field of column and straining beam integrated construction, and discloses a column and straining beam integrated construction system which comprises an operation platform, a plurality of pier formwork mechanisms, a straining beam supporting mechanism and a straining beam supporting mechanism, and each pier formwork mechanism is arranged on each pier column; in the first non-straining beam pouring section, the operation platform surrounds all the pier formwork mechanisms, the operation platform comprises a lifting unit and a detachable platform, the detachable platform is arranged between the adjacent pier formwork mechanisms, and the lifting unit comprises a steel cable; in the first straining beam pouring section, the straining beam supporting mechanism replaces the detachable platform to be arranged between the adjacent pier formwork mechanisms, the straining beam supporting mechanism comprises a distribution support and two outriggers, and the outriggers are connected with the two adjacent pier column poured sections. The problems that construction efficiency and safety are low when a straining beam supporting mechanism is erected and dismantled in the high altitude are solved.
本发明涉及柱系梁一体化施工领域,公开了一种柱系梁一体化施工系统,包括操作平台、若干桥墩模板机构、系梁支撑机构和系梁支撑机构,每个桥墩模板机构分别设置在每个墩柱上;在第一个非系梁浇筑段,操作平台围住所有桥墩模板机构,操作平台包括提升单元和可拆平台,可拆平台设置在相邻桥墩模板机构之间,提升单元包括钢索;在第一个系梁浇筑段,系梁支撑机构取代可拆平台设置在相邻桥墩模板机构之间,系梁支撑机构包括分配支架和两个挑梁,挑梁均和相邻的两个墩柱已浇段连接。以解高空中搭设拆除系梁支撑机构,施工效率和安全性低的问题。
Column straining beam integrated construction system
The invention relates to the field of column and straining beam integrated construction, and discloses a column and straining beam integrated construction system which comprises an operation platform, a plurality of pier formwork mechanisms, a straining beam supporting mechanism and a straining beam supporting mechanism, and each pier formwork mechanism is arranged on each pier column; in the first non-straining beam pouring section, the operation platform surrounds all the pier formwork mechanisms, the operation platform comprises a lifting unit and a detachable platform, the detachable platform is arranged between the adjacent pier formwork mechanisms, and the lifting unit comprises a steel cable; in the first straining beam pouring section, the straining beam supporting mechanism replaces the detachable platform to be arranged between the adjacent pier formwork mechanisms, the straining beam supporting mechanism comprises a distribution support and two outriggers, and the outriggers are connected with the two adjacent pier column poured sections. The problems that construction efficiency and safety are low when a straining beam supporting mechanism is erected and dismantled in the high altitude are solved.
本发明涉及柱系梁一体化施工领域,公开了一种柱系梁一体化施工系统,包括操作平台、若干桥墩模板机构、系梁支撑机构和系梁支撑机构,每个桥墩模板机构分别设置在每个墩柱上;在第一个非系梁浇筑段,操作平台围住所有桥墩模板机构,操作平台包括提升单元和可拆平台,可拆平台设置在相邻桥墩模板机构之间,提升单元包括钢索;在第一个系梁浇筑段,系梁支撑机构取代可拆平台设置在相邻桥墩模板机构之间,系梁支撑机构包括分配支架和两个挑梁,挑梁均和相邻的两个墩柱已浇段连接。以解高空中搭设拆除系梁支撑机构,施工效率和安全性低的问题。
Column straining beam integrated construction system
一种柱系梁一体化施工系统
WANG YOUYI (author) / CAI DONGBO (author) / CHAI SHAOQIANG (author) / JIN CHUAN (author) / ZHANG PENG (author) / GAO SHANGZHONG (author) / ZHANG HUANQIANG (author) / YANG PING (author)
2023-11-28
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Lining beam pouring system for column and straining beam integrated construction
European Patent Office | 2023
|Multi-pier column and column straining beam integrated construction method
European Patent Office | 2023
|European Patent Office | 2023
|Rapid construction method for fabricated straining beam stand column
European Patent Office | 2023
|