A platform for research: civil engineering, architecture and urbanism
Construction method of building above goaf and building above goaf
The invention provides a construction method of a building above a goaf and the building above the goaf. The construction method of the building above the goaf comprises the following steps that S1, an area with the ore body mining depth larger than or equal to a first preset value and the earth surface inclination deformation value smaller than or equal to a second preset value serves as a construction area; s2, gravel is laid on the construction area so that a gravel cushion layer can be formed; s3, a concrete foundation is arranged on the gravel cushion layer; and S4, building a building on the concrete foundation. Therefore, the construction method of the building above the goaf has the advantages that the high-rise building can be conveniently constructed in the goaf, and the high-rise building is not prone to inclining.
本发明提出一种采空区上方建筑物建造方法和采空区上方建筑物。本发明的采空区上方建筑物建造方法,包括以下步骤:S1、将矿体采深大于等于第一预设值且地表倾斜变形值小于等于第二预设值的区域作为建造区域;S2、在所述建造区域上铺设砂石以便形成砂石垫层;S3、在所述砂石垫层上设置混凝土基础;S4、在所述混凝土基础上建造建筑物。因此,根据本发明的采空区上方建筑物建造方法具有便于在采空区建造高层建筑且使得高层建筑不易倾斜的优点。
Construction method of building above goaf and building above goaf
The invention provides a construction method of a building above a goaf and the building above the goaf. The construction method of the building above the goaf comprises the following steps that S1, an area with the ore body mining depth larger than or equal to a first preset value and the earth surface inclination deformation value smaller than or equal to a second preset value serves as a construction area; s2, gravel is laid on the construction area so that a gravel cushion layer can be formed; s3, a concrete foundation is arranged on the gravel cushion layer; and S4, building a building on the concrete foundation. Therefore, the construction method of the building above the goaf has the advantages that the high-rise building can be conveniently constructed in the goaf, and the high-rise building is not prone to inclining.
本发明提出一种采空区上方建筑物建造方法和采空区上方建筑物。本发明的采空区上方建筑物建造方法,包括以下步骤:S1、将矿体采深大于等于第一预设值且地表倾斜变形值小于等于第二预设值的区域作为建造区域;S2、在所述建造区域上铺设砂石以便形成砂石垫层;S3、在所述砂石垫层上设置混凝土基础;S4、在所述混凝土基础上建造建筑物。因此,根据本发明的采空区上方建筑物建造方法具有便于在采空区建造高层建筑且使得高层建筑不易倾斜的优点。
Construction method of building above goaf and building above goaf
采空区上方建筑物建造方法和采空区上方建筑物
LI XING (author) / LI YUE (author) / FANG JUN (author) / CAO XINKUAN (author) / TANG ZHIXIN (author) / GUO KEYI (author)
2023-11-28
Patent
Electronic Resource
Chinese
Pre-split surface blasting to modify goaf behavior above shortwall panels
British Library Conference Proceedings | 2007
|Pre-split surface blasting to modify goaf behavior above shortwall panels
British Library Conference Proceedings | 2007
|DOAJ | 2022
|Stress Analysis and Measures Resistance to Deformation of Coal Pipeline above Goaf
Trans Tech Publications | 2014
|