A platform for research: civil engineering, architecture and urbanism
Stiff steel corbel structure for bare concrete column and construction method of stiff steel corbel structure
According to the stiff steel corbel structure for the bare concrete column and the construction method of the stiff steel corbel structure, the bare concrete column and the stiff steel corbel arranged on the bare concrete column in an embedded mode are included, and the bare concrete column comprises a bottom bare column section, a pouring section and a top bare column section which are sequentially formed in a pouring mode from bottom to top; the pouring section is of a hollow structure; the stiff steel corbels are arranged in the hollow structures of the pouring sections, and the bottoms of the stiff steel corbels abut against the bottom fair-faced column sections. Compared with the prior art, the fair-faced concrete column is sequentially constructed in a sectional mode, so that the impression effect of the fair-faced concrete is guaranteed while it is guaranteed that the stiff steel corbel is installed accurately.
一种用于清水混凝土柱的劲性钢牛腿结构及其施工方法,包括清水混凝土柱和预埋式设置于清水混凝土柱上的劲性钢牛腿,所述清水混凝土柱包括自下而上依次浇筑成型的底部清水柱节段、浇筑节段和顶部清水柱节段,浇筑节段为中空结构;所述劲性钢牛腿设置于浇筑节段的中空结构内,且劲性钢牛腿底部与底部清水柱节段抵接;与现有技术相比,通过对清水混凝土柱的分段式依次施工,保证安装劲性钢牛腿精准的同时,保证清水混凝土的观感效果。
Stiff steel corbel structure for bare concrete column and construction method of stiff steel corbel structure
According to the stiff steel corbel structure for the bare concrete column and the construction method of the stiff steel corbel structure, the bare concrete column and the stiff steel corbel arranged on the bare concrete column in an embedded mode are included, and the bare concrete column comprises a bottom bare column section, a pouring section and a top bare column section which are sequentially formed in a pouring mode from bottom to top; the pouring section is of a hollow structure; the stiff steel corbels are arranged in the hollow structures of the pouring sections, and the bottoms of the stiff steel corbels abut against the bottom fair-faced column sections. Compared with the prior art, the fair-faced concrete column is sequentially constructed in a sectional mode, so that the impression effect of the fair-faced concrete is guaranteed while it is guaranteed that the stiff steel corbel is installed accurately.
一种用于清水混凝土柱的劲性钢牛腿结构及其施工方法,包括清水混凝土柱和预埋式设置于清水混凝土柱上的劲性钢牛腿,所述清水混凝土柱包括自下而上依次浇筑成型的底部清水柱节段、浇筑节段和顶部清水柱节段,浇筑节段为中空结构;所述劲性钢牛腿设置于浇筑节段的中空结构内,且劲性钢牛腿底部与底部清水柱节段抵接;与现有技术相比,通过对清水混凝土柱的分段式依次施工,保证安装劲性钢牛腿精准的同时,保证清水混凝土的观感效果。
Stiff steel corbel structure for bare concrete column and construction method of stiff steel corbel structure
一种用于清水混凝土柱的劲性钢牛腿结构及其施工方法
XIANG JUNJIE (author) / YUAN LONGMING (author) / ZHOU CHAO (author) / YIN CHANGJIAN (author) / JIANG JIANKE (author) / WANG HANCHENG (author) / CHEN XINGAN (author) / WU SHANGYUE (author) / NI YANLE (author) / YU FENG (author)
2023-11-28
Patent
Electronic Resource
Chinese
Steel corbel device and construction method for jacking bridge through steel corbel device
European Patent Office | 2023
|European Patent Office | 2024
|European Patent Office | 2015
|