A platform for research: civil engineering, architecture and urbanism
Toilet tube well caisson device
The invention discloses a toilet tube well caisson device, and relates to the field of tube well caissons, the toilet tube well caisson device comprises a square tube support and a power source, and two groups of top transverse square tubes are arranged at the top end of the square tube support. The square tube support, the top plate, the square tube supporting diagonal draw bar and the top transverse square tube are spliced and welded into a whole, the shape is conical, the upper portion is large, the lower portion is small, material blocking during ascending is effectively prevented, before concrete pouring, the device is fixed to the upper portion of a steel bar according to a technical drawing, concrete is poured, and when formwork can be removed after the concrete is solidified, the movable cover plate is opened, and the formwork can be disassembled. The inner hexagonal plug is illustrated in the inner hexagonal sleeve, the power source is started to drive the two-way threaded rod to rotate to drive the top plate to ascend, so that the device and concrete are demolded, the quick disassembly effect is achieved, the scheme is easy to operate and high in assembly and disassembly efficiency, the concrete surface is good in effect efficiency after demolding, second-generation filling is not needed, the construction efficiency can be improved, and the construction quality can also be improved.
本发明公开了一种卫生间管井沉箱装置,涉及管井沉箱领域,包括方通支架与动力源,所述方通支架的顶端设有两组顶部横向方通。本发明通过将方通支架、顶板、方通支撑斜拉杆,顶部横向方通拼装焊接成整体,外形采用锥形,上大下小,有效防止上升时卡料,在混凝土浇筑前,按技术图纸把该装置固定在钢筋上方,浇筑混凝土,等混凝土凝固后可拆模时,打开活动盖板,将内六角插头插图内六角套内,启动动力源带动双向螺纹杆转动带动顶板上升,使该装置与混凝土脱模,达到快拆效果,该方案操作简单,安拆效率高,且拆模后混凝土面成效效率好,无需二代填补,实现既能提升施工效率,又能提高施工质量。
Toilet tube well caisson device
The invention discloses a toilet tube well caisson device, and relates to the field of tube well caissons, the toilet tube well caisson device comprises a square tube support and a power source, and two groups of top transverse square tubes are arranged at the top end of the square tube support. The square tube support, the top plate, the square tube supporting diagonal draw bar and the top transverse square tube are spliced and welded into a whole, the shape is conical, the upper portion is large, the lower portion is small, material blocking during ascending is effectively prevented, before concrete pouring, the device is fixed to the upper portion of a steel bar according to a technical drawing, concrete is poured, and when formwork can be removed after the concrete is solidified, the movable cover plate is opened, and the formwork can be disassembled. The inner hexagonal plug is illustrated in the inner hexagonal sleeve, the power source is started to drive the two-way threaded rod to rotate to drive the top plate to ascend, so that the device and concrete are demolded, the quick disassembly effect is achieved, the scheme is easy to operate and high in assembly and disassembly efficiency, the concrete surface is good in effect efficiency after demolding, second-generation filling is not needed, the construction efficiency can be improved, and the construction quality can also be improved.
本发明公开了一种卫生间管井沉箱装置,涉及管井沉箱领域,包括方通支架与动力源,所述方通支架的顶端设有两组顶部横向方通。本发明通过将方通支架、顶板、方通支撑斜拉杆,顶部横向方通拼装焊接成整体,外形采用锥形,上大下小,有效防止上升时卡料,在混凝土浇筑前,按技术图纸把该装置固定在钢筋上方,浇筑混凝土,等混凝土凝固后可拆模时,打开活动盖板,将内六角插头插图内六角套内,启动动力源带动双向螺纹杆转动带动顶板上升,使该装置与混凝土脱模,达到快拆效果,该方案操作简单,安拆效率高,且拆模后混凝土面成效效率好,无需二代填补,实现既能提升施工效率,又能提高施工质量。
Toilet tube well caisson device
一种卫生间管井沉箱装置
NI PENGFEI (author) / LI YUEHUA (author) / ZHANG JIAN (author) / BAI XUEDONG (author)
2023-11-28
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2024
|European Patent Office | 2024
|