A platform for research: civil engineering, architecture and urbanism
Inverted siphon inlet gate construction node and construction method
The invention discloses an inverted siphon inlet gate construction node and a construction method, and relates to the technical field of gate construction, the inverted siphon inlet gate construction node comprises a side door groove, a bottom groove and a gate, the gate comprises a front gate and a rear gate which are arranged in a staggered mode in the height direction, the front gate and the rear gate are both inserted into the side door groove, and the rear gate is inserted into the bottom groove at the same time; a blocking groove is formed in the ground of the side, away from the front gate, of the rear gate, and a water blocking piece used for being inserted into the blocking groove is fixed to the rear gate. A drainage device used for draining accumulated water in the bottom groove is further arranged in the bottom groove. The effect of improving the sealing performance of the gate is achieved.
本申请公开了一种倒虹吸进口闸施工节点及施工方法,涉及闸门施工的技术领域,包括侧门槽、底槽和闸门,所述闸门包括高度方向上交错设置的前闸门和后闸门,前闸门和后闸门均插接于侧门槽内,且后闸门同时插接于底槽内;后闸门远离前闸门的一侧地面上形成有封堵槽,后闸门上固定有用于插接至封堵槽内的堵水件;底槽内还设置有用于将底槽内的积水排出的排水装置。本申请具有提高闸门密封性的效果。
Inverted siphon inlet gate construction node and construction method
The invention discloses an inverted siphon inlet gate construction node and a construction method, and relates to the technical field of gate construction, the inverted siphon inlet gate construction node comprises a side door groove, a bottom groove and a gate, the gate comprises a front gate and a rear gate which are arranged in a staggered mode in the height direction, the front gate and the rear gate are both inserted into the side door groove, and the rear gate is inserted into the bottom groove at the same time; a blocking groove is formed in the ground of the side, away from the front gate, of the rear gate, and a water blocking piece used for being inserted into the blocking groove is fixed to the rear gate. A drainage device used for draining accumulated water in the bottom groove is further arranged in the bottom groove. The effect of improving the sealing performance of the gate is achieved.
本申请公开了一种倒虹吸进口闸施工节点及施工方法,涉及闸门施工的技术领域,包括侧门槽、底槽和闸门,所述闸门包括高度方向上交错设置的前闸门和后闸门,前闸门和后闸门均插接于侧门槽内,且后闸门同时插接于底槽内;后闸门远离前闸门的一侧地面上形成有封堵槽,后闸门上固定有用于插接至封堵槽内的堵水件;底槽内还设置有用于将底槽内的积水排出的排水装置。本申请具有提高闸门密封性的效果。
Inverted siphon inlet gate construction node and construction method
一种倒虹吸进口闸施工节点及施工方法
CAO YANHUA (author) / XU WEIZHOU (author) / MAO BINGYI (author) / ZHOU HE (author) / JIN BINGBING (author) / ZHAO YU (author) / JIA CHAO (author) / CHEN MING (author) / SUN HONGCHAO (author) / ZHAO YANG (author)
2023-12-01
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Construction of a concrete inverted siphon
Engineering Index Backfile | 1921
Inverted siphon pre-stressed anchor cable construction method
European Patent Office | 2023
|Design and construction of notus canal inverted siphon
Engineering Index Backfile | 1920
Inverted siphon design construction device for BIM design and construction method thereof
European Patent Office | 2024
|