A platform for research: civil engineering, architecture and urbanism
Auxiliary equipment for prestressed pipe pile construction in rainy season
The auxiliary equipment for rainy season prestressed pipe pile construction comprises a bottom plate and a lifting adjusting mechanism, the lifting adjusting mechanism is arranged at the top of the bottom plate, limiting plates are symmetrically arranged on the side faces of the lifting adjusting mechanism, and the two limiting plates are movably sleeved with cover plates; a connecting rod is arranged on the side face, away from the limiting plate, of the lifting adjusting mechanism, and a guide pipe is arranged at the end of the connecting rod. The invention belongs to the technical field of prestressed pipe piles, and particularly relates to auxiliary equipment for prestressed pipe pile construction in rainy seasons.
本发明公开了一种雨季预应力管桩施工用辅助设备,包括底板和升降调节机构,所述升降调节机构设于底板顶部,所述升降调节机构侧面上对称设有限位板,两组所述限位板上移动套接设有盖板,所述升降调节机构远离限位板的侧面上设有连接杆,所述连接杆端部设有导向管。本发明属于预应力管桩技术领域,具体是指一种雨季预应力管桩施工用辅助设备。
Auxiliary equipment for prestressed pipe pile construction in rainy season
The auxiliary equipment for rainy season prestressed pipe pile construction comprises a bottom plate and a lifting adjusting mechanism, the lifting adjusting mechanism is arranged at the top of the bottom plate, limiting plates are symmetrically arranged on the side faces of the lifting adjusting mechanism, and the two limiting plates are movably sleeved with cover plates; a connecting rod is arranged on the side face, away from the limiting plate, of the lifting adjusting mechanism, and a guide pipe is arranged at the end of the connecting rod. The invention belongs to the technical field of prestressed pipe piles, and particularly relates to auxiliary equipment for prestressed pipe pile construction in rainy seasons.
本发明公开了一种雨季预应力管桩施工用辅助设备,包括底板和升降调节机构,所述升降调节机构设于底板顶部,所述升降调节机构侧面上对称设有限位板,两组所述限位板上移动套接设有盖板,所述升降调节机构远离限位板的侧面上设有连接杆,所述连接杆端部设有导向管。本发明属于预应力管桩技术领域,具体是指一种雨季预应力管桩施工用辅助设备。
Auxiliary equipment for prestressed pipe pile construction in rainy season
一种雨季预应力管桩施工用辅助设备
QIAO ZHIBING (author) / WANG HAITING (author) / SHIN SUNG-YONG (author) / LI MING (author) / WANG JIZHONG (author) / YAN BAOJIN (author) / TANG CHAOQUN (author) / ZHANG NIU (author) / LU XIWEN (author) / HUANG GUOQING (author)
2023-12-01
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of prestressed pipe pile and specially-made prestressed pipe pile thereof
European Patent Office | 2020
|Pile planting construction method for prestressed pipe pile
European Patent Office | 2023
|