Earth excavation transmission method for soft soil deep foundation pit
The invention discloses a soft soil deep foundation pit earth excavation transmission method. The method comprises the following steps that S1, mechanical arrangement is conducted; s2, earthwork excavation: excavating earthwork by a crawler wheel bucket excavator, and excavating earthwork at a complex structure by a common excavator; s3, earthwork is conveyed, specifically, the earthwork is continuously conveyed to a belt conveyor through a conveying belt assembled on the crawler wheel bucket excavator; s4, earthwork compression, wherein earthwork enters a compression bin, and the earthwork is compacted through a hydraulic roller structure; s5, earthwork filling is conducted, specifically, when earthwork is compacted and reaches the loading capacity of a hopper of the muck truck, a bottom plate of the compression bin is opened, and the earthwork enters the muck truck; s6, vehicle washing: after loading is completed, a washing device is automatically started to wash the vehicle, and after washing is completed, the muck vehicle is driven out; and S7, the vehicles are guided to enter, after earthwork is compressed again, the rear vehicles are guided to enter the position below the compression filling device, and the steps S5 and S6 are repeated. According to the construction method, the limitation of factors such as sites, foundation pit supporting components and machines on traditional deep foundation pit earthwork engineering is reduced.
本发明公开一种软土深基坑土方开挖传输方法,包括如下步骤:S1、机械布置;S2、土方开挖:履带轮斗挖掘机开挖土方,普通挖掘机开挖结构复杂处的土方;S3、传输土方:通过履带轮斗挖掘机自身装配有的传送带,土方持续向皮带传输机输送;S4、土方压缩:土方进入压缩仓,通过液压滚筒结构对土方进行压实;S5、土方装填:土方压实并达到渣土车车斗装载量时,打开压缩仓的底板,土方进入渣土车;S6、冲洗车辆:装车完成后,冲洗装置自动开启,对车辆进行冲洗,冲洗完成后,渣土车驶出;S7、引导车辆进入:土方再次压缩后,引导后方车辆驶入压缩装填装置下方,重复步骤S5和S6,本发明减小传统深基坑土方工程受场地、基坑支护构件、机械等因素限制。
Earth excavation transmission method for soft soil deep foundation pit
The invention discloses a soft soil deep foundation pit earth excavation transmission method. The method comprises the following steps that S1, mechanical arrangement is conducted; s2, earthwork excavation: excavating earthwork by a crawler wheel bucket excavator, and excavating earthwork at a complex structure by a common excavator; s3, earthwork is conveyed, specifically, the earthwork is continuously conveyed to a belt conveyor through a conveying belt assembled on the crawler wheel bucket excavator; s4, earthwork compression, wherein earthwork enters a compression bin, and the earthwork is compacted through a hydraulic roller structure; s5, earthwork filling is conducted, specifically, when earthwork is compacted and reaches the loading capacity of a hopper of the muck truck, a bottom plate of the compression bin is opened, and the earthwork enters the muck truck; s6, vehicle washing: after loading is completed, a washing device is automatically started to wash the vehicle, and after washing is completed, the muck vehicle is driven out; and S7, the vehicles are guided to enter, after earthwork is compressed again, the rear vehicles are guided to enter the position below the compression filling device, and the steps S5 and S6 are repeated. According to the construction method, the limitation of factors such as sites, foundation pit supporting components and machines on traditional deep foundation pit earthwork engineering is reduced.
本发明公开一种软土深基坑土方开挖传输方法,包括如下步骤:S1、机械布置;S2、土方开挖:履带轮斗挖掘机开挖土方,普通挖掘机开挖结构复杂处的土方;S3、传输土方:通过履带轮斗挖掘机自身装配有的传送带,土方持续向皮带传输机输送;S4、土方压缩:土方进入压缩仓,通过液压滚筒结构对土方进行压实;S5、土方装填:土方压实并达到渣土车车斗装载量时,打开压缩仓的底板,土方进入渣土车;S6、冲洗车辆:装车完成后,冲洗装置自动开启,对车辆进行冲洗,冲洗完成后,渣土车驶出;S7、引导车辆进入:土方再次压缩后,引导后方车辆驶入压缩装填装置下方,重复步骤S5和S6,本发明减小传统深基坑土方工程受场地、基坑支护构件、机械等因素限制。
Earth excavation transmission method for soft soil deep foundation pit
一种软土深基坑土方开挖传输方法
LIU YASONG (author) / ZHAO YU (author) / GE JUN (author) / ZOU FENG (author) / HUANG WEIXING (author) / ZHU WENZHOU (author) / QUAN YOUWEI (author)
2023-12-01
Patent
Electronic Resource
Chinese
Soft soil deep foundation pit hydraulic impact excavation type earth excavation method
European Patent Office | 2023
|Earth excavation method for water-rich mucky soft soil deep foundation pit
European Patent Office | 2024
|Excavation construction method of soft soil layer deep foundation pit
European Patent Office | 2020
|Soft foundation soil layer ultra-deep foundation pit excavation equipment and construction method
European Patent Office | 2023
|