A platform for research: civil engineering, architecture and urbanism
Construction method for building river-crossing subway underground station
The invention provides a construction method for building a river-crossing subway underground station, relates to the technical field of rail transit construction, and aims to solve the problems that the existing river-crossing subway underground station is low in construction efficiency and poor in long-term operation reliability. When the supporting structure is constructed, an upstream cofferdam is directly constructed, the strength of the cofferdam is improved, the anti-seepage capacity of the cofferdam is improved, a temporary supporting structure in the foundation pit supporting mechanism is designed to be a permanent structure, the anti-floating capacity of an underground subway station is improved, waste of construction materials is greatly reduced, and the reliability requirement for long-term operation of the station is met; the flow guide pipe is arranged for river water flow guide to meet drainage requirements and flood control requirements.
本发明提供一种用于修建跨河地铁地下车站的施工方法,涉及轨道交通施工技术领域,针对目前跨河地铁地下车站施工效率低且长期运行可靠性差的问题,在设置围堰后,处于上游的围堰兼做施工便道,在支护结构施工时直接于上游围堰施工,增加围堰的强度并提高其防渗透能力,将基坑支护机构中的临时支撑结构、临时支护结构设计为永久结构,提高地下地铁车站的抗浮能力,大大减少施工材料浪费,满足车站长期运行的可靠性要求,设置导流管进行河水导流,满足排水需求,满足防洪要求。
Construction method for building river-crossing subway underground station
The invention provides a construction method for building a river-crossing subway underground station, relates to the technical field of rail transit construction, and aims to solve the problems that the existing river-crossing subway underground station is low in construction efficiency and poor in long-term operation reliability. When the supporting structure is constructed, an upstream cofferdam is directly constructed, the strength of the cofferdam is improved, the anti-seepage capacity of the cofferdam is improved, a temporary supporting structure in the foundation pit supporting mechanism is designed to be a permanent structure, the anti-floating capacity of an underground subway station is improved, waste of construction materials is greatly reduced, and the reliability requirement for long-term operation of the station is met; the flow guide pipe is arranged for river water flow guide to meet drainage requirements and flood control requirements.
本发明提供一种用于修建跨河地铁地下车站的施工方法,涉及轨道交通施工技术领域,针对目前跨河地铁地下车站施工效率低且长期运行可靠性差的问题,在设置围堰后,处于上游的围堰兼做施工便道,在支护结构施工时直接于上游围堰施工,增加围堰的强度并提高其防渗透能力,将基坑支护机构中的临时支撑结构、临时支护结构设计为永久结构,提高地下地铁车站的抗浮能力,大大减少施工材料浪费,满足车站长期运行的可靠性要求,设置导流管进行河水导流,满足排水需求,满足防洪要求。
Construction method for building river-crossing subway underground station
一种用于修建跨河地铁地下车站的施工方法
HAN GANG (author) / LI CHAO (author) / ZHOU ZHIYU (author) / LIU XIAOLONG (author) / ZHANG GUANGDA (author) / LIU HAO (author) / MA JINGRUI (author) / LIU XINJIN (author) / YAO CHENCHEN (author) / SHI SHAOGANG (author)
2023-12-01
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2024
|Subway station over crossing existing tunnel and construction method thereof
European Patent Office | 2020
|Subway station building assembly type construction method
European Patent Office | 2023
|Floor-free supporting structure of viaduct crossing subway station building
European Patent Office | 2024
|