A platform for research: civil engineering, architecture and urbanism
Pouring structure of settlement post-cast strip and construction method of post-cast strip
The invention relates to the field of post-cast strip structures, in particular to a settlement post-cast strip pouring structure and a post-cast strip construction method.The settlement post-cast strip pouring structure comprises a formwork supporting plate used for supporting a post-cast strip, a cover plate used for blocking a pouring cavity of the post-cast strip and a pouring steel pipe penetrating through the cover plate to communicate with the interior of the pouring cavity; an observation pipe is vertically arranged on the formwork supporting plate, the upper end face of the observation pipe is not lower than the upper surface of the poured foundation top plate, and the lower end of the observation pipe penetrates through the formwork supporting plate and extends to the position below the formwork supporting plate. The device has the advantages that workers can conveniently judge whether concrete in the pouring cavity reaches the designed thickness or not, and the pouring effect of the post-pouring belt is improved.
本申请涉及后浇带结构领域,尤其涉及一种沉降后浇带浇筑结构及后浇带的施工方法,其包括用于对后浇带进行支撑的模撑板、用于对后浇带的浇筑腔进行封堵的盖板以及穿过盖板与浇筑腔内部连通的灌注钢管,所述模撑板上设置有观察管,所述观察管竖直设置,所述观察管上端面不低于已浇筑完成的基础顶板的上表面,所述观察管下端穿过模撑板延伸至模撑板下方。本申请具有方便工作人员判断浇筑腔内混凝土是否达到设计厚度,提高后浇带浇筑效果。
Pouring structure of settlement post-cast strip and construction method of post-cast strip
The invention relates to the field of post-cast strip structures, in particular to a settlement post-cast strip pouring structure and a post-cast strip construction method.The settlement post-cast strip pouring structure comprises a formwork supporting plate used for supporting a post-cast strip, a cover plate used for blocking a pouring cavity of the post-cast strip and a pouring steel pipe penetrating through the cover plate to communicate with the interior of the pouring cavity; an observation pipe is vertically arranged on the formwork supporting plate, the upper end face of the observation pipe is not lower than the upper surface of the poured foundation top plate, and the lower end of the observation pipe penetrates through the formwork supporting plate and extends to the position below the formwork supporting plate. The device has the advantages that workers can conveniently judge whether concrete in the pouring cavity reaches the designed thickness or not, and the pouring effect of the post-pouring belt is improved.
本申请涉及后浇带结构领域,尤其涉及一种沉降后浇带浇筑结构及后浇带的施工方法,其包括用于对后浇带进行支撑的模撑板、用于对后浇带的浇筑腔进行封堵的盖板以及穿过盖板与浇筑腔内部连通的灌注钢管,所述模撑板上设置有观察管,所述观察管竖直设置,所述观察管上端面不低于已浇筑完成的基础顶板的上表面,所述观察管下端穿过模撑板延伸至模撑板下方。本申请具有方便工作人员判断浇筑腔内混凝土是否达到设计厚度,提高后浇带浇筑效果。
Pouring structure of settlement post-cast strip and construction method of post-cast strip
一种沉降后浇带浇筑结构及后浇带的施工方法
LI HELEI (author) / ZHANG CAN (author) / JIANG JIAQI (author) / YANG LEYOU (author) / LIU ZHIGUANG (author) / LI CHAOGANG (author) / LIU XIN (author) / WANG YAO (author) / CHEN HUA (author) / WEI LEI (author)
2023-12-01
Patent
Electronic Resource
Chinese
Post-cast strip formwork and construction method for pouring post-cast strip
European Patent Office | 2021
|Foundation post-cast strip formwork and construction method for pouring post-cast strip
European Patent Office | 2024
|Self-compacting concrete pouring construction method for settlement post-cast strip
European Patent Office | 2024
|Post-cast strip pouring equipment and construction method thereof
European Patent Office | 2021
|