Assembly type sewage intercepting well installation method
The invention discloses an assembly type sewage intercepting well mounting method which comprises the following steps: S100, excavating a foundation pit, and arranging a hardened cushion layer on the foundation pit; s200, a base of the assembly type sewage intercepting well is hoisted to the hardened cushion layer to be installed and fixed; s300, a shaft is inserted into a positioning groove of the base; s400, the connector position between the shaft and the base is wrapped with a steel wire mesh, and then waterproof concrete is adopted for sealing treatment; and S500, a closed water test is carried out, and the position with the leakage phenomenon is closed and complemented. According to the assembly type sewage interception well installation method, the assembly type sewage interception well is designed in a split mode and can be machined into a structure with a larger size, the requirement for the larger size of the sewage interception well is met, the sewage treatment amount is increased, the applicability is improved, the shaft is assembled and positioned through the positioning grooves in the shaft assembling process, and the assembly efficiency is improved. The shaft and the base can be quickly assembled in place, the construction difficulty is effectively reduced, the construction period is shortened, and the assembly precision is improved.
本发明公开了一种装配式截污井安装方法,包括以下步骤:S100:开挖基坑,并在基坑上设置硬化垫层;S200:将装配式截污井的基座吊运至所述硬化垫层上安装固定;S300:将井筒插接于所述基座的定位槽中;S400:在井筒和基座之间的接口位置包裹钢丝网片,然后采用防水混凝土进行密封处理;S500:进行闭水试验,对有渗漏现象的位置进行封闭补全。本发明提供的装配式截污井安装方法中的装配式截污井采用分体式设计,可加工成更大尺寸的结构,满足截污井更大体积的要求,提升污水处理量,提升适用性,并且在拼装井筒的过程中通过定位槽对井筒进行装配定位,能够将井筒和基座快速拼装到位,有效降低施工难度,缩短施工周期,提升装配精度。
Assembly type sewage intercepting well installation method
The invention discloses an assembly type sewage intercepting well mounting method which comprises the following steps: S100, excavating a foundation pit, and arranging a hardened cushion layer on the foundation pit; s200, a base of the assembly type sewage intercepting well is hoisted to the hardened cushion layer to be installed and fixed; s300, a shaft is inserted into a positioning groove of the base; s400, the connector position between the shaft and the base is wrapped with a steel wire mesh, and then waterproof concrete is adopted for sealing treatment; and S500, a closed water test is carried out, and the position with the leakage phenomenon is closed and complemented. According to the assembly type sewage interception well installation method, the assembly type sewage interception well is designed in a split mode and can be machined into a structure with a larger size, the requirement for the larger size of the sewage interception well is met, the sewage treatment amount is increased, the applicability is improved, the shaft is assembled and positioned through the positioning grooves in the shaft assembling process, and the assembly efficiency is improved. The shaft and the base can be quickly assembled in place, the construction difficulty is effectively reduced, the construction period is shortened, and the assembly precision is improved.
本发明公开了一种装配式截污井安装方法,包括以下步骤:S100:开挖基坑,并在基坑上设置硬化垫层;S200:将装配式截污井的基座吊运至所述硬化垫层上安装固定;S300:将井筒插接于所述基座的定位槽中;S400:在井筒和基座之间的接口位置包裹钢丝网片,然后采用防水混凝土进行密封处理;S500:进行闭水试验,对有渗漏现象的位置进行封闭补全。本发明提供的装配式截污井安装方法中的装配式截污井采用分体式设计,可加工成更大尺寸的结构,满足截污井更大体积的要求,提升污水处理量,提升适用性,并且在拼装井筒的过程中通过定位槽对井筒进行装配定位,能够将井筒和基座快速拼装到位,有效降低施工难度,缩短施工周期,提升装配精度。
Assembly type sewage intercepting well installation method
装配式截污井安装方法
YANG HAOYUAN (author) / ZHOU ZHILIN (author) / LIU BO (author) / XIA LINJUAN (author) / LIU XIAOPEI (author)
2023-12-01
Patent
Electronic Resource
Chinese
European Patent Office | 2021
|Prefabricated sewage intercepting well construction method
European Patent Office | 2020
|