Steel structure grid device and construction method thereof
The invention relates to a steel structure grid device and a construction method thereof. The steel structure grid device comprises a supporting component, a driving device and a plurality of truss sections. The supporting component comprises a sliding face, the sliding face comprises a mounting area and a moving area, guide rails are arranged on the two sides of the sliding face and extend to the moving area along the mounting area, and the truss segments are driven by a driving device to slide along the guide rails and slide to the moving area from the mounting area. Firstly, a first truss section is hoisted and installed to an installation area, the first truss section is driven by a driving device to move to a moving area, then a second truss section is installed in the installation area, the second truss section is connected with the first truss section, and the first truss section and the second truss section are moved at the same time through the driving device; and the second truss section slides away from the installation area, the next truss section is convenient to install, and the truss sections are installed and spliced section by section and are driven to slide at the same time until all the truss sections slide in place.
本申请涉及一种钢结构网架装置及其施工方法,包括支撑构件、驱动装置以及若干桁架节段;支撑构件包括滑移面,滑移面包括安装区域和移动区域,滑移面的两侧设有导轨,导轨沿安装区域延伸至移动区域,通过驱动装置带动桁架节段沿导轨滑移,从安装区域滑移至移动区域;首先将第一节桁架节段吊装安装至安装区域,通过驱动装置带动第一节桁架节段移至移动区域,随后在安装区域安装第二节桁架节段,并将第二节桁架节段与第一节桁架节段连接,通过驱动装置将第一桁架节与第二桁架节段同时移动,使第二桁架节段滑离安装区域,便于安装下一节桁架节段,以此逐节安装拼接,同时驱动滑移,直到将各节桁架节段滑移到位。
Steel structure grid device and construction method thereof
The invention relates to a steel structure grid device and a construction method thereof. The steel structure grid device comprises a supporting component, a driving device and a plurality of truss sections. The supporting component comprises a sliding face, the sliding face comprises a mounting area and a moving area, guide rails are arranged on the two sides of the sliding face and extend to the moving area along the mounting area, and the truss segments are driven by a driving device to slide along the guide rails and slide to the moving area from the mounting area. Firstly, a first truss section is hoisted and installed to an installation area, the first truss section is driven by a driving device to move to a moving area, then a second truss section is installed in the installation area, the second truss section is connected with the first truss section, and the first truss section and the second truss section are moved at the same time through the driving device; and the second truss section slides away from the installation area, the next truss section is convenient to install, and the truss sections are installed and spliced section by section and are driven to slide at the same time until all the truss sections slide in place.
本申请涉及一种钢结构网架装置及其施工方法,包括支撑构件、驱动装置以及若干桁架节段;支撑构件包括滑移面,滑移面包括安装区域和移动区域,滑移面的两侧设有导轨,导轨沿安装区域延伸至移动区域,通过驱动装置带动桁架节段沿导轨滑移,从安装区域滑移至移动区域;首先将第一节桁架节段吊装安装至安装区域,通过驱动装置带动第一节桁架节段移至移动区域,随后在安装区域安装第二节桁架节段,并将第二节桁架节段与第一节桁架节段连接,通过驱动装置将第一桁架节与第二桁架节段同时移动,使第二桁架节段滑离安装区域,便于安装下一节桁架节段,以此逐节安装拼接,同时驱动滑移,直到将各节桁架节段滑移到位。
Steel structure grid device and construction method thereof
一种钢结构网架装置及其施工方法
DENG XIAOLEI (author) / GAO TIEJIAN (author) / GONG ZHENYU (author) / CHEN MO (author) / WANG WENJIE (author) / GAO YINGXIANG (author) / GAO JIANGUO (author) / XU ZHENFENG (author) / LI BAOXIN (author)
2023-12-01
Patent
Electronic Resource
Chinese
Large-span steel grid structure and construction technology thereof
European Patent Office | 2023
|Steel grid sprayed concrete combined dome structure and construction method thereof
European Patent Office | 2022
|Steel grid structure composite wall structure system and construction process thereof
European Patent Office | 2023
|Integral hoisting construction method for steel structure grid
European Patent Office | 2021
|