A platform for research: civil engineering, architecture and urbanism
Triangular truss decorative steel structure transfer layer positioning and mounting method
A triangular truss decorative steel structure transfer layer positioning and mounting method comprises the following steps that S1, a first preset mounting position of a triangular truss is marked on a reserved purlin support; s2, marking a second preset mounting position on a mounting plate of the triangular truss; s3, the pipe fitting of the triangular truss is installed at the second preset installation position; and S4, the mounting plate is mounted at a first preset mounting position. According to the triangular truss decorative steel structure transfer layer positioning and mounting method, a first preset mounting position is marked on a reserved purlin support, a second preset mounting position is marked on a mounting plate of a triangular truss, and pipe fittings of the triangular truss are aligned and welded to the second preset mounting position on the mounting plate; and finally, the mounting plate is mounted at the first preset mounting position, and the mounting method improves the overall mounting precision and improves the overall mounting efficiency.
一种三角桁架装饰钢结构转换层定位安装方法,包括如下步骤:S1,在预留檩托上标记三角桁架的第一预设安装位置;S2,在三角桁架的安装板上标记第二预设安装位置;S3,将三角桁架的管件安装在第二预设安装位置;S4,将所述安装板安装在第一预设安装位置。该三角桁架装饰钢结构转换层定位安装方法,通过在预留檩托上标记第一预设安装位置,并且在三角桁架的安装板上标记第二预设安装位置,将三角桁架的的管件对齐焊接在安装板上的第二预设安装位置处,最后将安装板安装在第一预设安装位置,该安装方法提升了整体的安装精度,且提升了整体的安装效率。
Triangular truss decorative steel structure transfer layer positioning and mounting method
A triangular truss decorative steel structure transfer layer positioning and mounting method comprises the following steps that S1, a first preset mounting position of a triangular truss is marked on a reserved purlin support; s2, marking a second preset mounting position on a mounting plate of the triangular truss; s3, the pipe fitting of the triangular truss is installed at the second preset installation position; and S4, the mounting plate is mounted at a first preset mounting position. According to the triangular truss decorative steel structure transfer layer positioning and mounting method, a first preset mounting position is marked on a reserved purlin support, a second preset mounting position is marked on a mounting plate of a triangular truss, and pipe fittings of the triangular truss are aligned and welded to the second preset mounting position on the mounting plate; and finally, the mounting plate is mounted at the first preset mounting position, and the mounting method improves the overall mounting precision and improves the overall mounting efficiency.
一种三角桁架装饰钢结构转换层定位安装方法,包括如下步骤:S1,在预留檩托上标记三角桁架的第一预设安装位置;S2,在三角桁架的安装板上标记第二预设安装位置;S3,将三角桁架的管件安装在第二预设安装位置;S4,将所述安装板安装在第一预设安装位置。该三角桁架装饰钢结构转换层定位安装方法,通过在预留檩托上标记第一预设安装位置,并且在三角桁架的安装板上标记第二预设安装位置,将三角桁架的的管件对齐焊接在安装板上的第二预设安装位置处,最后将安装板安装在第一预设安装位置,该安装方法提升了整体的安装精度,且提升了整体的安装效率。
Triangular truss decorative steel structure transfer layer positioning and mounting method
一种三角桁架装饰钢结构转换层定位安装方法
LIAN ZHEN (author) / YU JIASHENG (author) / LU XINHUA (author) / YU JIE (author) / LIU MIAOMIAO (author) / JIANG YINI (author) / WANG ZHIQIN (author) / HE ANXIANG (author) / GUO LIANGQIAN (author)
2023-12-01
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Inclined truss steel structure transfer layer structure and mounting method thereof
European Patent Office | 2024
|Spatial inverted triangular pyramid steel truss and mounting method thereof
European Patent Office | 2023
|European Patent Office | 2022
|Steel truss mounting system and steel truss mounting method
European Patent Office | 2023
|Steel pipe mounting and positioning method for steel structure pipe truss construction
European Patent Office | 2023
|