A platform for research: civil engineering, architecture and urbanism
Tower crane foundation
The invention relates to the field of building construction, in particular to a tower crane foundation which comprises a plurality of slope protection piles, the slope protection piles are arranged at intervals in an L shape, the slope protection piles are arranged at the bottom of a foundation pit, and the slope protection piles are used for bearing a tower crane; the tower crane piles are arranged at intervals, the tower crane piles and the slope protection piles are distributed in a square shape, and the tower crane piles and the slope protection piles form positions where tower cranes are placed; the pre-embedded device is arranged above the slope protection pile and the tower crane pile, is used for connecting the slope protection pile and the tower crane and is also used for connecting the tower crane pile and the tower crane, and the pre-embedded device comprises a horse stool assembly arranged on the slope protection pile and the tower crane pile at the same time and a supporting leg assembly connected with the tower crane. According to the tower crane foundation, the bearing capacity of the tower crane foundation can be guaranteed under the condition that small-space installation is met.
本申请涉及建筑施工的领域,尤其是涉及一种塔吊基础,其包括护坡桩,设置有多个,多个所述护坡桩间隔设置并且呈L形排列,所述护坡桩设置在基坑的底部,所述护坡桩用于承载塔吊;塔吊桩,设置有多个,多个所述塔吊桩间隔设置并且与所述护坡桩形成正方形分布,所述塔吊桩与所述护坡桩形成供塔吊放置的位置;预埋装置,设置在所述护坡桩和所述塔吊桩的上方,用于连接所述护坡桩和塔吊,还用于连接所述塔吊桩和塔吊,所述预埋装置包括同时设置在所述护坡桩和所述塔吊桩上的马凳组件以及与塔吊相连接的支腿组件。本申请能够在满足小空间安装的条件下,能够保证塔吊基础的承载力。
Tower crane foundation
The invention relates to the field of building construction, in particular to a tower crane foundation which comprises a plurality of slope protection piles, the slope protection piles are arranged at intervals in an L shape, the slope protection piles are arranged at the bottom of a foundation pit, and the slope protection piles are used for bearing a tower crane; the tower crane piles are arranged at intervals, the tower crane piles and the slope protection piles are distributed in a square shape, and the tower crane piles and the slope protection piles form positions where tower cranes are placed; the pre-embedded device is arranged above the slope protection pile and the tower crane pile, is used for connecting the slope protection pile and the tower crane and is also used for connecting the tower crane pile and the tower crane, and the pre-embedded device comprises a horse stool assembly arranged on the slope protection pile and the tower crane pile at the same time and a supporting leg assembly connected with the tower crane. According to the tower crane foundation, the bearing capacity of the tower crane foundation can be guaranteed under the condition that small-space installation is met.
本申请涉及建筑施工的领域,尤其是涉及一种塔吊基础,其包括护坡桩,设置有多个,多个所述护坡桩间隔设置并且呈L形排列,所述护坡桩设置在基坑的底部,所述护坡桩用于承载塔吊;塔吊桩,设置有多个,多个所述塔吊桩间隔设置并且与所述护坡桩形成正方形分布,所述塔吊桩与所述护坡桩形成供塔吊放置的位置;预埋装置,设置在所述护坡桩和所述塔吊桩的上方,用于连接所述护坡桩和塔吊,还用于连接所述塔吊桩和塔吊,所述预埋装置包括同时设置在所述护坡桩和所述塔吊桩上的马凳组件以及与塔吊相连接的支腿组件。本申请能够在满足小空间安装的条件下,能够保证塔吊基础的承载力。
Tower crane foundation
一种塔吊基础
DU XIAOLONG (author) / CHEN YONGFU (author) / GUO ZHIHUA (author) / LIU HONGDANG (author) / WU KAI (author) / ZHANG DEWEI (author) / XU SHILONG (author) / CHEN FENG (author)
2023-12-05
Patent
Electronic Resource
Chinese
Tower crane foundation, tower crane and mounting method of tower crane
European Patent Office | 2024
|Method for arranging tower crane foundation and tower crane foundation structure
European Patent Office | 2023
|Tower crane foundation for foundation pit and construction method of tower crane foundation
European Patent Office | 2020
|