A platform for research: civil engineering, architecture and urbanism
Quickly-built concrete full-prefabricated assembly type frame structure building and construction method
The invention discloses a rapidly-built concrete full-prefabricated assembly type frame structure building and a construction method, a prefabricated column is connected with a building foundation by grouting a sleeve, beam-column joints are matched for operation in a fixed connection and hinged mode, a prefabricated beam can be stably assembled on the prefabricated column, and the construction efficiency is improved. Then, the BRB supporting pieces are assembled on the prefabricated columns to resist the horizontal load of a building, the bearing effect of the building and buckling restrained brace are improved, and the double-T plates are connected with cantilever beams of the prefabricated beams in a welded mode to serve as the top of the building or a floor between floors; and after stair joint bars reserved on the upper portions of the prefabricated stair beams are connected with the prefabricated stairs, grouting is conducted to complete installation of the prefabricated stairs, and finally the ALC light partition boards are installed to serve as a vertical enclosure structure. In conclusion, material resources can be effectively saved, weather influence is small, the construction period is obviously shortened, and labor input can be reduced.
本发明公开了快速建造混凝土全预制装配式框架结构建筑及施工方法,预制柱通过向套筒灌浆的方式与建筑基础连接,梁柱节点采用固接、铰接的方式配合作业,能够将预制梁稳定装配至预制柱上,之后通过在预制柱上装配BRB支撑件以抵抗建筑的水平载荷,提高建筑承重效果和屈曲约束支撑,双T板采用焊接方式与预制梁的挑梁连接,作为建筑顶或楼层之间的地板,预制梯梁上部预留的楼梯插筋与预制楼梯连接后注浆完成预制楼梯安装,最后安装ALC轻质隔墙板作为竖向围护结构。综合而言,本申请能够有效节约材料资源,受天气影响较小,施工周期明显缩短,能够减少劳动力的投入。
Quickly-built concrete full-prefabricated assembly type frame structure building and construction method
The invention discloses a rapidly-built concrete full-prefabricated assembly type frame structure building and a construction method, a prefabricated column is connected with a building foundation by grouting a sleeve, beam-column joints are matched for operation in a fixed connection and hinged mode, a prefabricated beam can be stably assembled on the prefabricated column, and the construction efficiency is improved. Then, the BRB supporting pieces are assembled on the prefabricated columns to resist the horizontal load of a building, the bearing effect of the building and buckling restrained brace are improved, and the double-T plates are connected with cantilever beams of the prefabricated beams in a welded mode to serve as the top of the building or a floor between floors; and after stair joint bars reserved on the upper portions of the prefabricated stair beams are connected with the prefabricated stairs, grouting is conducted to complete installation of the prefabricated stairs, and finally the ALC light partition boards are installed to serve as a vertical enclosure structure. In conclusion, material resources can be effectively saved, weather influence is small, the construction period is obviously shortened, and labor input can be reduced.
本发明公开了快速建造混凝土全预制装配式框架结构建筑及施工方法,预制柱通过向套筒灌浆的方式与建筑基础连接,梁柱节点采用固接、铰接的方式配合作业,能够将预制梁稳定装配至预制柱上,之后通过在预制柱上装配BRB支撑件以抵抗建筑的水平载荷,提高建筑承重效果和屈曲约束支撑,双T板采用焊接方式与预制梁的挑梁连接,作为建筑顶或楼层之间的地板,预制梯梁上部预留的楼梯插筋与预制楼梯连接后注浆完成预制楼梯安装,最后安装ALC轻质隔墙板作为竖向围护结构。综合而言,本申请能够有效节约材料资源,受天气影响较小,施工周期明显缩短,能够减少劳动力的投入。
Quickly-built concrete full-prefabricated assembly type frame structure building and construction method
快速建造混凝土全预制装配式框架结构建筑及施工方法
CHEN LIXIONG (author) / XIAO KE (author) / WANG WENYONG (author) / ZHU DONGPO (author) / LIU JIACHENG (author) / ZHANG GUOFU (author) / ZHANG BINGBING (author) / LIU ZHENLIN (author) / SU QUANRU (author)
2023-12-05
Patent
Electronic Resource
Chinese
Full-prefabricated assembly type concrete frame structure and construction method thereof
European Patent Office | 2024
|Quickly-installed prefabricated assembled building frame
European Patent Office | 2020
|Full-prefabricated assembly type concrete modular building and construction method
European Patent Office | 2024
|European Patent Office | 2023
|Construction method for quickly connecting prefabricated concrete components
European Patent Office | 2020
|