A platform for research: civil engineering, architecture and urbanism
Building outer wall sealant construction method
The invention relates to the technical field of building construction, in particular to a building outer wall sealant construction method which comprises the following steps: S1, on the premise of meeting the expansion allowance of a base material, designing and assembling the width of an outer wall panel joint of an integral concrete shear wall structure; s2, joint treatment is carried out; s3, a backing material is placed on a joint of the surface of the base material; s4, masking tape is pasted to the external corners, on the two sides of the joint, of the base material respectively; step S5, brushing a base coat, and uniformly brushing the base coat on the bonding surface of the base material; and S6, after the prime coat is dried, sealant is constructed for joint filling. The construction method is suitable for the sealant construction of the external wall panel joint of the assembled integral concrete shear wall structure, the building external wall has a long-term effective waterproof sealing effect, the waterproof sealing effect of the building external wall is improved, and the maintenance cost of a building is low.
本申请涉及建筑施工技术领域,尤其是涉及,一种建筑外墙密封胶施工方法,包括以下步骤:步骤S1,在满足基材伸缩余量前提下,设计装配整体式混凝土剪力墙结构外墙板接缝宽度;步骤S2,接缝处理;步骤S3,在基材表面的接缝放置背衬材料;步骤S4,在接缝两侧的基材阳角分别粘贴美纹纸胶带;步骤S5,涂刷底涂,底涂均匀涂刷在基材粘结面;步骤S6,待底涂干燥后,施工密封胶填缝。本申请的施工方法适用于装配整体式混凝土剪力墙结构外墙板接缝密封胶施工,建筑外墙具有长期有效的防水密封效果,提高了建筑外墙的防水密封效果,建筑的维护成本低。
Building outer wall sealant construction method
The invention relates to the technical field of building construction, in particular to a building outer wall sealant construction method which comprises the following steps: S1, on the premise of meeting the expansion allowance of a base material, designing and assembling the width of an outer wall panel joint of an integral concrete shear wall structure; s2, joint treatment is carried out; s3, a backing material is placed on a joint of the surface of the base material; s4, masking tape is pasted to the external corners, on the two sides of the joint, of the base material respectively; step S5, brushing a base coat, and uniformly brushing the base coat on the bonding surface of the base material; and S6, after the prime coat is dried, sealant is constructed for joint filling. The construction method is suitable for the sealant construction of the external wall panel joint of the assembled integral concrete shear wall structure, the building external wall has a long-term effective waterproof sealing effect, the waterproof sealing effect of the building external wall is improved, and the maintenance cost of a building is low.
本申请涉及建筑施工技术领域,尤其是涉及,一种建筑外墙密封胶施工方法,包括以下步骤:步骤S1,在满足基材伸缩余量前提下,设计装配整体式混凝土剪力墙结构外墙板接缝宽度;步骤S2,接缝处理;步骤S3,在基材表面的接缝放置背衬材料;步骤S4,在接缝两侧的基材阳角分别粘贴美纹纸胶带;步骤S5,涂刷底涂,底涂均匀涂刷在基材粘结面;步骤S6,待底涂干燥后,施工密封胶填缝。本申请的施工方法适用于装配整体式混凝土剪力墙结构外墙板接缝密封胶施工,建筑外墙具有长期有效的防水密封效果,提高了建筑外墙的防水密封效果,建筑的维护成本低。
Building outer wall sealant construction method
一种建筑外墙密封胶施工方法
MA LIANG (author) / MA HAIYAN (author) / YANG FAN (author) / CHEN JIE (author) / ZHANG DENGBIAO (author) / ZHANG GUIMING (author) / ZHANG ZHIWEI (author)
2023-12-05
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS