Modular assembly method for workshop roof truss
The invention relates to the technical field of building construction, in particular to a modular assembly method for a workshop roof truss, which comprises the following steps: preparing an assembly platform, and determining the angle, height, spacing and other parameters of the assembly platform according to the length and angle of the roof truss on a design drawing; according to the relevant parameters of the roof truss, an assembly platform is erected, and the elevation of the assembly platform is verified; roof truss splicing and welding are conducted on the assembling platform; grouping the plurality of roof trusses, and welding roof purlins among the grouped roof trusses; and the whole combined roof truss is hoisted. The construction process of an existing assembling method is simplified, hoisting is carried out after assembling is completed through the assembling platform, the construction difficulty is lowered on the premise that the assembling precision is guaranteed, and the construction efficiency is improved.
本发明涉及建筑施工技术领域,特别是涉及一种厂房屋架模块化组装方法,准备组装平台,根据设计图纸上屋架的长度和角度,确定组装平台的角度、高度以及间距等参数;根据屋架的相关参数,搭设组装平台,并核验组装平台的标高;在组装平台上进行屋架拼装和焊接;将多个屋架进行组队,并在组队的屋架之间焊接屋面檩条;对组合屋架整体进行吊装。本发明简化了现有组装方法的施工工序,利用组装平台组装完成后再进行吊装,在确保组装精度的前提下降低施工难度,提高了施工效率。
Modular assembly method for workshop roof truss
The invention relates to the technical field of building construction, in particular to a modular assembly method for a workshop roof truss, which comprises the following steps: preparing an assembly platform, and determining the angle, height, spacing and other parameters of the assembly platform according to the length and angle of the roof truss on a design drawing; according to the relevant parameters of the roof truss, an assembly platform is erected, and the elevation of the assembly platform is verified; roof truss splicing and welding are conducted on the assembling platform; grouping the plurality of roof trusses, and welding roof purlins among the grouped roof trusses; and the whole combined roof truss is hoisted. The construction process of an existing assembling method is simplified, hoisting is carried out after assembling is completed through the assembling platform, the construction difficulty is lowered on the premise that the assembling precision is guaranteed, and the construction efficiency is improved.
本发明涉及建筑施工技术领域,特别是涉及一种厂房屋架模块化组装方法,准备组装平台,根据设计图纸上屋架的长度和角度,确定组装平台的角度、高度以及间距等参数;根据屋架的相关参数,搭设组装平台,并核验组装平台的标高;在组装平台上进行屋架拼装和焊接;将多个屋架进行组队,并在组队的屋架之间焊接屋面檩条;对组合屋架整体进行吊装。本发明简化了现有组装方法的施工工序,利用组装平台组装完成后再进行吊装,在确保组装精度的前提下降低施工难度,提高了施工效率。
Modular assembly method for workshop roof truss
厂房屋架模块化组装方法
LIU XUEJUN (author) / XU JIULI (author) / ZHOU HAINAN (author) / ZHANG YONGZONG (author) / ZHANG JIANDONG (author)
2023-12-05
Patent
Electronic Resource
Chinese
Modular assembly type concrete roof truss assembly method
European Patent Office | 2024
|