Rapid positioning and laying method for straight tower foundation of overhead line
The invention provides an overhead line straight line tower foundation rapid positioning and laying method which comprises the steps that S1, a telescopic frame is arranged at a 1 # pile position on the ground, a telescopic pole on the telescopic frame is commanded to be placed at a direction pile position on the ground, and the advancing direction of a line is determined; s3, basic point location identification: S3.1, one end of an auxiliary rod is assembled on a telescopic frame, and the other end of the auxiliary rod is assembled on an identification rod; s3.2, a supporting assembly in the identification rod is rotated to be in a horizontal state; s3.3, the top end of the marking mechanism is hung on the auxiliary rod, and the side face of the marking mechanism is assembled at the outer end of the supporting assembly; and S3.4, translating and adjusting the marking mechanism to the square root of 2/2L position. Each pile position can be quickly and accurately determined, and the auxiliary rod and the identification rod can be assembled nearby, so that secondary correction can be performed on the identification rod, and errors caused by long-distance observation and manual command are eliminated.
本发明提供架空线路直线杆塔基础快速定位布设方法,包括S1、远望架设在地面的1#桩位处,通过远望架上的望远镜指挥花杆放置在地面的方向桩处,确定线路前进方向;S3、基础点位标识:S3.1、将辅助杆的一端装配在远望架上、另一端装配在标识杆上;S3.2、转动标识杆内的支撑组件至水平状态;S3.3、将标记机构的顶端悬挂在辅助杆上、侧面装配在支撑组件外端;S3.4、平移调节标记机构至√2/2L位置处。本发明能够快速、精确的确定各个桩位,辅助杆可与标识杆就近装配,这样能够对标识杆进行二次校正,从而消除远距离观察及人工指挥时而导致的误差。
Rapid positioning and laying method for straight tower foundation of overhead line
The invention provides an overhead line straight line tower foundation rapid positioning and laying method which comprises the steps that S1, a telescopic frame is arranged at a 1 # pile position on the ground, a telescopic pole on the telescopic frame is commanded to be placed at a direction pile position on the ground, and the advancing direction of a line is determined; s3, basic point location identification: S3.1, one end of an auxiliary rod is assembled on a telescopic frame, and the other end of the auxiliary rod is assembled on an identification rod; s3.2, a supporting assembly in the identification rod is rotated to be in a horizontal state; s3.3, the top end of the marking mechanism is hung on the auxiliary rod, and the side face of the marking mechanism is assembled at the outer end of the supporting assembly; and S3.4, translating and adjusting the marking mechanism to the square root of 2/2L position. Each pile position can be quickly and accurately determined, and the auxiliary rod and the identification rod can be assembled nearby, so that secondary correction can be performed on the identification rod, and errors caused by long-distance observation and manual command are eliminated.
本发明提供架空线路直线杆塔基础快速定位布设方法,包括S1、远望架设在地面的1#桩位处,通过远望架上的望远镜指挥花杆放置在地面的方向桩处,确定线路前进方向;S3、基础点位标识:S3.1、将辅助杆的一端装配在远望架上、另一端装配在标识杆上;S3.2、转动标识杆内的支撑组件至水平状态;S3.3、将标记机构的顶端悬挂在辅助杆上、侧面装配在支撑组件外端;S3.4、平移调节标记机构至√2/2L位置处。本发明能够快速、精确的确定各个桩位,辅助杆可与标识杆就近装配,这样能够对标识杆进行二次校正,从而消除远距离观察及人工指挥时而导致的误差。
Rapid positioning and laying method for straight tower foundation of overhead line
架空线路直线杆塔基础快速定位布设方法
WANG GAN (author) / HE MENGJIE (author) / WANG JIAN (author) / ZHU DAIFA (author) / HU XIBING (author) / JIANG QIANJUN (author) / XU MENGXIA (author) / ZHU QINGHUA (author) / WANG FUGEN (author) / LIU ZUOHOU (author)
2023-12-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
OVERHEAD LINE TOWER FOUNDATION CONNECTION METHOD AND CONNECTION APPARATUS
European Patent Office | 2020
|Double-loop steel pipe tower overhead line straight pull-down structure
European Patent Office | 2020
|European Patent Office | 2022
|Foundation structure of mobile tower crane and laying method of foundation structure
European Patent Office | 2015
|