Pretreatment construction method for karst cave filled with flow-state solidified soil
The invention discloses a pretreatment construction method for a karst cave filled with flow-state solidified soil, which comprises the following steps: taking a drill hole revealed to the karst cave as a reference hole, arranging a plurality of exploration holes around the reference hole, and exploring the boundary of the karst cave; a plurality of filling holes are drilled downwards from the ground within the boundary range of the karst cave, and the bottom ends of the filling holes communicate with the karst cave; pre-mixed flow state solidified soil is prepared; prepared premixed flow-state solidified soil is poured from the filling hole until the karst cave is filled; and after the grouting construction is finished, the hole opening of the slurry filling hole is blocked. According to the method, the boundary of the large karst cave can be quickly and accurately explored, the method is particularly suitable for large or super-large karst/soil caves, the karst cave is filled with the premixed flow-state solidified soil, a traditional method for treating the karst/soil caves through grouting concrete is replaced, the construction cost is reduced, filling is targeted, and the pretreatment effect is effectively guaranteed.
本发明公开了一种充填流态固化土的溶洞预处理施工方法,包括将已揭示到溶洞的钻孔作为基准孔,围绕基准孔布置若干个勘探孔,探寻溶洞的边界;在溶洞的边界范围内从地面向下钻设若干个填充孔,所述填充孔的底端连通于溶洞;配置预拌流态固化土;从填充孔灌注已经配置的预拌流态固化土,直至溶洞填满;注浆施工结束后,浆填充孔的孔口封堵。能够快速且准确的探寻大型溶洞的边界,特别适用于大型或特大型溶/土洞,采用预拌流态固化土充填溶洞,代替传统注浆混凝土处理溶土洞方法,降低施工成本,充填有针对性且有效保证预处理效果。
Pretreatment construction method for karst cave filled with flow-state solidified soil
The invention discloses a pretreatment construction method for a karst cave filled with flow-state solidified soil, which comprises the following steps: taking a drill hole revealed to the karst cave as a reference hole, arranging a plurality of exploration holes around the reference hole, and exploring the boundary of the karst cave; a plurality of filling holes are drilled downwards from the ground within the boundary range of the karst cave, and the bottom ends of the filling holes communicate with the karst cave; pre-mixed flow state solidified soil is prepared; prepared premixed flow-state solidified soil is poured from the filling hole until the karst cave is filled; and after the grouting construction is finished, the hole opening of the slurry filling hole is blocked. According to the method, the boundary of the large karst cave can be quickly and accurately explored, the method is particularly suitable for large or super-large karst/soil caves, the karst cave is filled with the premixed flow-state solidified soil, a traditional method for treating the karst/soil caves through grouting concrete is replaced, the construction cost is reduced, filling is targeted, and the pretreatment effect is effectively guaranteed.
本发明公开了一种充填流态固化土的溶洞预处理施工方法,包括将已揭示到溶洞的钻孔作为基准孔,围绕基准孔布置若干个勘探孔,探寻溶洞的边界;在溶洞的边界范围内从地面向下钻设若干个填充孔,所述填充孔的底端连通于溶洞;配置预拌流态固化土;从填充孔灌注已经配置的预拌流态固化土,直至溶洞填满;注浆施工结束后,浆填充孔的孔口封堵。能够快速且准确的探寻大型溶洞的边界,特别适用于大型或特大型溶/土洞,采用预拌流态固化土充填溶洞,代替传统注浆混凝土处理溶土洞方法,降低施工成本,充填有针对性且有效保证预处理效果。
Pretreatment construction method for karst cave filled with flow-state solidified soil
一种充填流态固化土的溶洞预处理施工方法
WEI SHICHUN (author) / TAN YUNFEI (author) / FU WEICAI (author) / DONG SHIXIAN (author) / MAI JUNXIAN (author)
2023-12-12
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Karst cave pouring and backfilling construction method for flow-state solidified soil
European Patent Office | 2024
|Filling and replacement construction method for flow-state solidified soil karst cave
European Patent Office | 2024
|Filling and replacing construction system for flow-state solidified soil karst cave
European Patent Office | 2024
|European Patent Office | 2024
|HIGH-PRESSURE PRE-FILLED KARST CAVE PILE FOUNDATION CONSTRUCTION METHOD
European Patent Office | 2023
|