Method for treating buried pipeline soft soil foundation
The invention relates to a method for treating a buried pipeline soft soil foundation, and relates to the technical field of soft soil foundation pipeline construction. The method comprises the following steps that S1, steel pipes serve as pile foundations and are arranged in soil bodies on the two sides of a pipeline correspondingly, steel pipe piles are formed, and the lower ends of the steel pipe piles are pressed into a bearing stratum; s2, the upper portions of the steel pipe piles on the two sides of the pipeline are connected through steel cross beams to form a supporting foundation for the pipeline; and S3, the pipeline is erected on the steel cross beam and fixed to the steel cross beam. The method has the effects of stabilizing pipeline support, reducing the influence of uneven settlement of the soft soil foundation on pipeline connector connection, enhancing the bearing capacity of the pipeline and improving the construction efficiency of the pipeline.
本申请涉及一种用于处理埋地管道软土地基的方法,涉及软土地基管道施工技术的领域。其包括如下步骤:S1、采用钢管作为桩基础,分别布置在管道两侧的土体内,形成钢管桩,钢管桩下端压入持力层;S2、管道两侧的钢管桩上部采用钢横梁进行连接,构成对管道的支撑基础;S3、将管道架设在钢横梁上并与钢横梁相固定。本申请具有稳定管道支撑,降低软土地基不均匀沉降对管道接口连接的影响,增强管道承载力以及提高管道施工效率的效果。
Method for treating buried pipeline soft soil foundation
The invention relates to a method for treating a buried pipeline soft soil foundation, and relates to the technical field of soft soil foundation pipeline construction. The method comprises the following steps that S1, steel pipes serve as pile foundations and are arranged in soil bodies on the two sides of a pipeline correspondingly, steel pipe piles are formed, and the lower ends of the steel pipe piles are pressed into a bearing stratum; s2, the upper portions of the steel pipe piles on the two sides of the pipeline are connected through steel cross beams to form a supporting foundation for the pipeline; and S3, the pipeline is erected on the steel cross beam and fixed to the steel cross beam. The method has the effects of stabilizing pipeline support, reducing the influence of uneven settlement of the soft soil foundation on pipeline connector connection, enhancing the bearing capacity of the pipeline and improving the construction efficiency of the pipeline.
本申请涉及一种用于处理埋地管道软土地基的方法,涉及软土地基管道施工技术的领域。其包括如下步骤:S1、采用钢管作为桩基础,分别布置在管道两侧的土体内,形成钢管桩,钢管桩下端压入持力层;S2、管道两侧的钢管桩上部采用钢横梁进行连接,构成对管道的支撑基础;S3、将管道架设在钢横梁上并与钢横梁相固定。本申请具有稳定管道支撑,降低软土地基不均匀沉降对管道接口连接的影响,增强管道承载力以及提高管道施工效率的效果。
Method for treating buried pipeline soft soil foundation
一种用于处理埋地管道软土地基的方法
YANG YUCHEN (author) / XIANG XINYI (author) / SHEN QIAN (author) / AN ZHOU (author) / JIN MENG (author) / WU HAIHONG (author) / HE NANTING (author)
2023-12-12
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for preventing settlement of buried drainage pipeline in soft foundation
European Patent Office | 2024
|European Patent Office | 2022
|European Patent Office | 2023
|Permafrost foundation refrigerating structure for buried heat pipeline
European Patent Office | 2015
|