A platform for research: civil engineering, architecture and urbanism
Prefabricated column hoisting rapid in-place device and construction method thereof
The invention discloses a prefabricated column hoisting rapid in-place device and a construction method thereof.The prefabricated column hoisting rapid in-place device comprises a rigid frame body, a steel protection plate is arranged at the top of the rigid frame body, a hinge is arranged on one side of the steel protection plate, a movable block is arranged on one side of the hinge, and a lock catch is arranged on the side, away from the hinge, of the movable block; universal wheels are arranged at the bottom of the rigid frame body, an angle rib positioning plate is arranged on the inner wall of the rigid frame body, the movable block is rotationally connected with the steel protection plate through a hinge, and the movable block is clamped with the steel protection plate through a lock catch. And various processing data of the device can be extracted. The corner rib positioning plate on the device can ensure that a prefabricated column sleeve is completely aligned with a reserved steel bar, the purpose of quickly installing the prefabricated column in place is achieved, and the problems that a traditional prefabricated column is difficult to hoist in place, low in efficiency and large in potential safety hazard are solved.
本发明公开了一种预制柱吊装快速就位装置及其施工方法,其中包括刚性架体,所述刚性架体的顶部设置有钢护板,所述钢护板的一侧设置有铰链,所述铰链的一侧设置有活动块,所述活动块远离铰链的一侧设置有锁扣,所述刚性架体的底部设置有万向轮,所述刚性架体的内壁设置有角筋定位板,所述活动块通过铰链与钢护板转动连接,且活动块通过锁扣与钢护板相互卡合,该方法可以通过BIM参数化对不同尺寸的预制柱设计装置模型,并能够提取出装置的各项加工数据。本装置上的角筋定位板可确保预制柱套筒与预留钢筋完全对齐,达到预制柱快速安装就位的目的,并解决了传统预制柱吊装就位难、效率低、安全隐患较大的难题。
Prefabricated column hoisting rapid in-place device and construction method thereof
The invention discloses a prefabricated column hoisting rapid in-place device and a construction method thereof.The prefabricated column hoisting rapid in-place device comprises a rigid frame body, a steel protection plate is arranged at the top of the rigid frame body, a hinge is arranged on one side of the steel protection plate, a movable block is arranged on one side of the hinge, and a lock catch is arranged on the side, away from the hinge, of the movable block; universal wheels are arranged at the bottom of the rigid frame body, an angle rib positioning plate is arranged on the inner wall of the rigid frame body, the movable block is rotationally connected with the steel protection plate through a hinge, and the movable block is clamped with the steel protection plate through a lock catch. And various processing data of the device can be extracted. The corner rib positioning plate on the device can ensure that a prefabricated column sleeve is completely aligned with a reserved steel bar, the purpose of quickly installing the prefabricated column in place is achieved, and the problems that a traditional prefabricated column is difficult to hoist in place, low in efficiency and large in potential safety hazard are solved.
本发明公开了一种预制柱吊装快速就位装置及其施工方法,其中包括刚性架体,所述刚性架体的顶部设置有钢护板,所述钢护板的一侧设置有铰链,所述铰链的一侧设置有活动块,所述活动块远离铰链的一侧设置有锁扣,所述刚性架体的底部设置有万向轮,所述刚性架体的内壁设置有角筋定位板,所述活动块通过铰链与钢护板转动连接,且活动块通过锁扣与钢护板相互卡合,该方法可以通过BIM参数化对不同尺寸的预制柱设计装置模型,并能够提取出装置的各项加工数据。本装置上的角筋定位板可确保预制柱套筒与预留钢筋完全对齐,达到预制柱快速安装就位的目的,并解决了传统预制柱吊装就位难、效率低、安全隐患较大的难题。
Prefabricated column hoisting rapid in-place device and construction method thereof
一种预制柱吊装快速就位装置及其施工方法
HUO RULI (author) / WU XUDONG (author) / YANG KAI (author) / LI ZHONG (author) / WEI HONGMING (author) / ZHOU YUHAO (author) / LIU HONGQING (author) / HUO TAO (author) / WANG YUN (author)
2023-12-19
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Prefabricated column hoisting device and construction method thereof
European Patent Office | 2023
|Prefabricated box girder hoisting device and rapid construction method
European Patent Office | 2023
|Prefabricated pier column reinforcement cage and integral hoisting construction method thereof
European Patent Office | 2023
|