Prefabricated pier column reinforcement cage and integral hoisting construction method thereof
According to the prefabricated pier column reinforcement cage and the integral hoisting construction method thereof, firstly, horizontal hoisting points of the pier column reinforcement cage are designed according to a design drawing, and the bending moment of the pier column reinforcement cage in the hoisting process can be effectively reduced through reasonable arrangement of the horizontal hoisting points; in the process of supporting the reinforcement cage, a plurality of cross-shaped inclined struts are transversely arranged in the reinforcement cage at intervals, herringbone supports are arranged on the side wall, various peripheral auxiliary frame bodies do not need to be erected in the manufacturing process of the cross-shaped inclined struts and the herringbone supports, site material taking and manufacturing are convenient and fast, the overall rigidity of the pier column reinforcement cage during hoisting is effectively improved, and the construction cost is reduced. The pier column reinforcement cage can be rapidly hoisted in place, the overall stability and safety of the reinforcement cage in the hoisting process can be guaranteed, manpower and mechanical use are saved, and the construction efficiency and the construction safety are improved.
本发明公开了一种预制墩柱钢筋笼及其整体吊装施工方法,首先根据设计图纸设计墩柱钢筋笼的水平吊点,水平吊点的合理布置能够有效降低吊运过程墩柱钢筋笼的弯矩,其次,在支座钢筋笼的过程中在其内部横向间隔设置多个交叉十字斜撑,以及在侧壁上设置人字撑,而且交叉十字斜撑和人字撑制作过程中不需要搭设各种外围辅助架体,现场取材制作方便快捷,有效增加墩柱钢筋笼吊装时的整体刚度,使墩柱钢筋笼能快速吊装到位,并且能保证钢筋笼在吊装过程的整体稳定性和安全性,节约人力和机械使用,提高施工效率和施工的安全性。
Prefabricated pier column reinforcement cage and integral hoisting construction method thereof
According to the prefabricated pier column reinforcement cage and the integral hoisting construction method thereof, firstly, horizontal hoisting points of the pier column reinforcement cage are designed according to a design drawing, and the bending moment of the pier column reinforcement cage in the hoisting process can be effectively reduced through reasonable arrangement of the horizontal hoisting points; in the process of supporting the reinforcement cage, a plurality of cross-shaped inclined struts are transversely arranged in the reinforcement cage at intervals, herringbone supports are arranged on the side wall, various peripheral auxiliary frame bodies do not need to be erected in the manufacturing process of the cross-shaped inclined struts and the herringbone supports, site material taking and manufacturing are convenient and fast, the overall rigidity of the pier column reinforcement cage during hoisting is effectively improved, and the construction cost is reduced. The pier column reinforcement cage can be rapidly hoisted in place, the overall stability and safety of the reinforcement cage in the hoisting process can be guaranteed, manpower and mechanical use are saved, and the construction efficiency and the construction safety are improved.
本发明公开了一种预制墩柱钢筋笼及其整体吊装施工方法,首先根据设计图纸设计墩柱钢筋笼的水平吊点,水平吊点的合理布置能够有效降低吊运过程墩柱钢筋笼的弯矩,其次,在支座钢筋笼的过程中在其内部横向间隔设置多个交叉十字斜撑,以及在侧壁上设置人字撑,而且交叉十字斜撑和人字撑制作过程中不需要搭设各种外围辅助架体,现场取材制作方便快捷,有效增加墩柱钢筋笼吊装时的整体刚度,使墩柱钢筋笼能快速吊装到位,并且能保证钢筋笼在吊装过程的整体稳定性和安全性,节约人力和机械使用,提高施工效率和施工的安全性。
Prefabricated pier column reinforcement cage and integral hoisting construction method thereof
一种预制墩柱钢筋笼及其整体吊装施工方法
CAO GENG (author) / REN LIJUN (author) / WANG LEI (author) / CHEN QIANG (author) / YE SUXIAN (author) / MIAO MIAO (author) / WU ZHENG (author) / ZHOU HONGLIANG (author) / ZHANG HAOTIAN (author) / ZHANG TINGHUA (author)
2023-01-20
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|Integral hoisting construction method for pier stud reinforcement cage
European Patent Office | 2021
|Positioning system and method for hoisting construction of viaduct pier column reinforcement cage
European Patent Office | 2022
|Urban rail viaduct Y-shaped vase pier body reinforcement cage integral hoisting construction method
European Patent Office | 2024
|