The invention discloses a construction method of a prefabricated floor support plate and a prefabricated floor support plate assembly. The construction method comprises the following steps that S1, the floor support plate is prefabricated according to a drawing; s2, the prefabricated floor support plate is hoisted to a preset installation position of a steel structure frame, and the prefabricated floor support plate and the steel structure frame are fixed; and S3, a side formwork is supported around the prefabricated floor support plate, the prefabricated floor support plate is poured, the prefabricated floor support plate assembly is assembled through the construction method of the prefabricated floor support plate and comprises the profiled steel sheet, the steel bar frame and the steel beam, the steel bar frame is assembled on the profiled steel sheet, and the profiled steel sheet is assembled on the steel beam. According to the construction method of the prefabricated floor support plate and the prefabricated floor support plate assembly, the manufactured prefabricated floor support plate is directly assembled on the steel beam, so that the time of formwork erecting operation is shortened, the overall construction efficiency is improved, the time of high-altitude construction is shortened, and the risk of high-altitude operation is reduced.
一种预制楼承板的施工方法及预制楼承板总成,该施工方法包括如下步骤:S1,按照图纸预制楼承板;S2,将所述预制楼承板吊装至钢结构框架的预设安装位置处,并将所述预制楼承板与钢结构框架进行固定;S3,围绕所述预制楼承板支边摸,并对预制楼承板进行浇筑,该预制楼承板总成采用上述的预制楼承板的施工方法进行装配,包括压型钢板、钢筋框架及钢梁,所述钢筋框架装配在所述压型钢板上,所述压型钢板装配在所述钢梁上。该预制楼承板的施工方法及预制楼承板总成,通过将制作好的预制楼承板直接装配在钢梁上,减少了支模作业的时间,提升了整体的施工效率,也减少了在高处施工的时间,降低了高空作业的风险。
The invention discloses a construction method of a prefabricated floor support plate and a prefabricated floor support plate assembly. The construction method comprises the following steps that S1, the floor support plate is prefabricated according to a drawing; s2, the prefabricated floor support plate is hoisted to a preset installation position of a steel structure frame, and the prefabricated floor support plate and the steel structure frame are fixed; and S3, a side formwork is supported around the prefabricated floor support plate, the prefabricated floor support plate is poured, the prefabricated floor support plate assembly is assembled through the construction method of the prefabricated floor support plate and comprises the profiled steel sheet, the steel bar frame and the steel beam, the steel bar frame is assembled on the profiled steel sheet, and the profiled steel sheet is assembled on the steel beam. According to the construction method of the prefabricated floor support plate and the prefabricated floor support plate assembly, the manufactured prefabricated floor support plate is directly assembled on the steel beam, so that the time of formwork erecting operation is shortened, the overall construction efficiency is improved, the time of high-altitude construction is shortened, and the risk of high-altitude operation is reduced.
一种预制楼承板的施工方法及预制楼承板总成,该施工方法包括如下步骤:S1,按照图纸预制楼承板;S2,将所述预制楼承板吊装至钢结构框架的预设安装位置处,并将所述预制楼承板与钢结构框架进行固定;S3,围绕所述预制楼承板支边摸,并对预制楼承板进行浇筑,该预制楼承板总成采用上述的预制楼承板的施工方法进行装配,包括压型钢板、钢筋框架及钢梁,所述钢筋框架装配在所述压型钢板上,所述压型钢板装配在所述钢梁上。该预制楼承板的施工方法及预制楼承板总成,通过将制作好的预制楼承板直接装配在钢梁上,减少了支模作业的时间,提升了整体的施工效率,也减少了在高处施工的时间,降低了高空作业的风险。
Construction method of prefabricated floor support plate and prefabricated floor support plate assembly
预制楼承板的施工方法及预制楼承板总成
2023-12-22
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Prefabricated combined floor support plate and floor slab
European Patent Office | 2021
|Assembly type prefabricated truss floor support plate device
European Patent Office | 2023
|ALC prefabricated floor support plate and construction method thereof
European Patent Office | 2022
|Prefabricated steel bar truss floor support plate and construction method
European Patent Office | 2023
|