Existing two-layer basement engineering pile construction method
The invention relates to an existing two-layer basement engineering pile construction method which is used for barrier removal construction of an existing basement structure and an original enclosure structure, the existing basement structure is arranged in the original enclosure structure and comprises a first underground layer and a second underground layer, original engineering piles are arranged at the bottom of the second underground layer, and the original engineering piles are arranged at the bottom of the second underground layer. According to the method, an existing basement obstacle clearing and engineering pile construction combined mode is adopted, and the construction problem of engineering piles is solved through two-stage construction, that is, the engineering piles are constructed on a top plate and a bottom plate of an existing basement respectively, so that the problem is solved. Compared with the prior art, the method has the advantages of good construction effect, high efficiency and the like.
本发明涉及一种既有两层地下室工程桩施工方法,用于既有地下室结构及原围护结构的清障施工,所述的既有地下室结构设于原围护结构内,所述的既有地下室结构包括地下一层和地下二层,所述的地下二层底部设有原工程桩,发明采取既有地下室清障与工程桩施工相结合方式,通过两阶段施工处理工程桩的施工难题,即采用在既有地下室顶板和底板上分别施工工程桩,以此来化解该难题。与现有技术相比,本发明具有施工效果好,效率高等优点。
Existing two-layer basement engineering pile construction method
The invention relates to an existing two-layer basement engineering pile construction method which is used for barrier removal construction of an existing basement structure and an original enclosure structure, the existing basement structure is arranged in the original enclosure structure and comprises a first underground layer and a second underground layer, original engineering piles are arranged at the bottom of the second underground layer, and the original engineering piles are arranged at the bottom of the second underground layer. According to the method, an existing basement obstacle clearing and engineering pile construction combined mode is adopted, and the construction problem of engineering piles is solved through two-stage construction, that is, the engineering piles are constructed on a top plate and a bottom plate of an existing basement respectively, so that the problem is solved. Compared with the prior art, the method has the advantages of good construction effect, high efficiency and the like.
本发明涉及一种既有两层地下室工程桩施工方法,用于既有地下室结构及原围护结构的清障施工,所述的既有地下室结构设于原围护结构内,所述的既有地下室结构包括地下一层和地下二层,所述的地下二层底部设有原工程桩,发明采取既有地下室清障与工程桩施工相结合方式,通过两阶段施工处理工程桩的施工难题,即采用在既有地下室顶板和底板上分别施工工程桩,以此来化解该难题。与现有技术相比,本发明具有施工效果好,效率高等优点。
Existing two-layer basement engineering pile construction method
一种既有两层地下室工程桩施工方法
LI ZHONGCHENG (author) / WENG XINRONG (author) / DAI SHENGLIANG (author) / TANG JUN (author) / ZHANG NING (author) / CHEN TAO (author) / GU CHENGXIONG (author)
2023-12-26
Patent
Electronic Resource
Chinese
Construction method for existing basement pile foundation with high water level
European Patent Office | 2020
|CONSTRUCTION METHOD OF TEMPORARY PILE INSTALLED IN BASEMENT FLOOR OF EXISTING STRUCTURE
European Patent Office | 2024
|European Patent Office | 2023
|Overall obstacle removing construction method for existing two-layer basement
European Patent Office | 2023
|