The anti-explosion formwork rod construction method comprises the following construction steps that S1, a screw of an anti-explosion formwork rod device transversely penetrates through two formworks through holes of the formworks, the two sides of the screw stretch out of the outer ends of the two formworks correspondingly, and sleeves located on the screw are located on the inner sides of the two formworks; s2, the hook pull rod of the explosion-proof mold rod is moved towards the inner side of the mold plate, and the hook part of the hook pull rod abuts against the inner side of the mold plate; s3, a plug of the anti-explosion mold rod is moved in the axial direction of the screw rod, the plug is tightly attached to the outer side of the formwork through a fixing assembly of the anti-explosion mold rod, and the hole is plugged; s4, concrete pouring; and S5, after pouring is completed, the fixing assembly is separated from the screw rod, then the plug is removed, the screw rod is pulled out of one side of the formwork, then the part, stretching out of the formwork, of the hook part is cut off, and the outer wall of the formwork is kept flat. By means of the construction method, the anti-explosion membrane rod piece forms double-F buckle stress in the formwork, and formwork explosion of the outer wall integrated insulation board is prevented.
本发明公开了一种防爆模杆施工方法,包括以下施工步骤:S1:将防爆模杆装置的螺杆通过模板的洞口横穿两个模板,且使螺杆的两侧分别从两个模板的外端伸出,且使位于螺杆上的套管位于两个模板的内侧;S2:将防爆模杆的带钩拉杆向模板的内侧移动,带钩拉杆的钩部抵紧模板的内侧;S3:将防爆模杆的堵头沿螺杆的轴向移动并通过防爆模杆的固定组件将堵头贴紧于模板的外侧,将洞口进行封堵;S4:混凝土浇筑;S5:浇筑完成后,将固定组件与螺杆分离,接着拆除堵头,将螺杆从模板的一侧拔出,然后将钩部伸出模板处部分进行切断,使模板的外壁保持平整。本施工方法使防爆膜杆件在模板内形成双F卡扣受力,防止外墙一体化保温板爆模。
Explosion-proof formwork rod construction method
The anti-explosion formwork rod construction method comprises the following construction steps that S1, a screw of an anti-explosion formwork rod device transversely penetrates through two formworks through holes of the formworks, the two sides of the screw stretch out of the outer ends of the two formworks correspondingly, and sleeves located on the screw are located on the inner sides of the two formworks; s2, the hook pull rod of the explosion-proof mold rod is moved towards the inner side of the mold plate, and the hook part of the hook pull rod abuts against the inner side of the mold plate; s3, a plug of the anti-explosion mold rod is moved in the axial direction of the screw rod, the plug is tightly attached to the outer side of the formwork through a fixing assembly of the anti-explosion mold rod, and the hole is plugged; s4, concrete pouring; and S5, after pouring is completed, the fixing assembly is separated from the screw rod, then the plug is removed, the screw rod is pulled out of one side of the formwork, then the part, stretching out of the formwork, of the hook part is cut off, and the outer wall of the formwork is kept flat. By means of the construction method, the anti-explosion membrane rod piece forms double-F buckle stress in the formwork, and formwork explosion of the outer wall integrated insulation board is prevented.
本发明公开了一种防爆模杆施工方法,包括以下施工步骤:S1:将防爆模杆装置的螺杆通过模板的洞口横穿两个模板,且使螺杆的两侧分别从两个模板的外端伸出,且使位于螺杆上的套管位于两个模板的内侧;S2:将防爆模杆的带钩拉杆向模板的内侧移动,带钩拉杆的钩部抵紧模板的内侧;S3:将防爆模杆的堵头沿螺杆的轴向移动并通过防爆模杆的固定组件将堵头贴紧于模板的外侧,将洞口进行封堵;S4:混凝土浇筑;S5:浇筑完成后,将固定组件与螺杆分离,接着拆除堵头,将螺杆从模板的一侧拔出,然后将钩部伸出模板处部分进行切断,使模板的外壁保持平整。本施工方法使防爆膜杆件在模板内形成双F卡扣受力,防止外墙一体化保温板爆模。
Explosion-proof formwork rod construction method
防爆模杆施工方法
DENG ZIWANG (author) / ZHOU BOLIN (author) / GU FENG (author) / SUN JIAWEI (author) / HUANG KUAN (author)
2023-12-29
Patent
Electronic Resource
Chinese
Formwork support of outrigger construction formwork, construction formwork and construction method
European Patent Office | 2024
|Haunching formwork, formwork frame and construction method of formwork frame
European Patent Office | 2023
|