Explosion-proof workshop main body construction method
The invention provides an explosion-proof workshop body construction method. The explosion-proof workshop body construction method comprises the following steps that S1, a workshop top steel structure is installed; s2, reinforcing steel bars are bound, wherein the reinforcing steel bars comprise bearing platform reinforcing steel bars, foundation reinforcing steel bars, column foot reinforcing steel bars, foundation column reinforcing steel bars and wallboard reinforcing steel bars; s3, concrete pouring is conducted according to the sequence from bottom to top; and S4, after the concrete reaches the specified strength, secondary structure construction is conducted, and a secondary structure comprises an inner filler wall and a constructional column. Firstly, steel structure construction is conducted, pouring of the bottom plate and the side wall is formed through integrated binding after construction is completed, the structural strength is guaranteed through integrated pouring, the construction steps are optimized, and the construction efficiency can be improved.
本发明提供一种防爆车间主体施工方法,包括以下步骤:步骤S1,对车间顶部钢结构进行安装;步骤S2,进行钢筋绑扎,钢筋包括承台钢筋、基础钢筋、柱脚钢筋、基础柱钢筋和墙板钢筋;步骤S3,按照自下向上的顺序以此进行混凝土浇筑;步骤S4,在混凝土到达指定强度后进行二次结构施工,二次结构包括内填充墙和构造柱。首先进行钢结构施工,施工完成后通过一体化绑扎形成底板和侧墙的浇筑,通过一体化的浇筑保证结构强度,优化施工步骤,可以提高施工的效率。
Explosion-proof workshop main body construction method
The invention provides an explosion-proof workshop body construction method. The explosion-proof workshop body construction method comprises the following steps that S1, a workshop top steel structure is installed; s2, reinforcing steel bars are bound, wherein the reinforcing steel bars comprise bearing platform reinforcing steel bars, foundation reinforcing steel bars, column foot reinforcing steel bars, foundation column reinforcing steel bars and wallboard reinforcing steel bars; s3, concrete pouring is conducted according to the sequence from bottom to top; and S4, after the concrete reaches the specified strength, secondary structure construction is conducted, and a secondary structure comprises an inner filler wall and a constructional column. Firstly, steel structure construction is conducted, pouring of the bottom plate and the side wall is formed through integrated binding after construction is completed, the structural strength is guaranteed through integrated pouring, the construction steps are optimized, and the construction efficiency can be improved.
本发明提供一种防爆车间主体施工方法,包括以下步骤:步骤S1,对车间顶部钢结构进行安装;步骤S2,进行钢筋绑扎,钢筋包括承台钢筋、基础钢筋、柱脚钢筋、基础柱钢筋和墙板钢筋;步骤S3,按照自下向上的顺序以此进行混凝土浇筑;步骤S4,在混凝土到达指定强度后进行二次结构施工,二次结构包括内填充墙和构造柱。首先进行钢结构施工,施工完成后通过一体化绑扎形成底板和侧墙的浇筑,通过一体化的浇筑保证结构强度,优化施工步骤,可以提高施工的效率。
Explosion-proof workshop main body construction method
一种防爆车间主体施工方法
GENG SHAOFENG (author) / CHEN YUZHOU (author) / ZHANG YINGHAO (author) / WU HUI (author) / LIU WEI (author) / LI YUNTIAN (author) / CHEN WENJIE (author) / CHEN ZENGYANG (author) / BAI WEIFENG (author) / SUN YAXING (author)
2024-09-03
Patent
Electronic Resource
Chinese
Explosion-proof workshop foundation static pressure pile construction method
European Patent Office | 2024
|European Patent Office | 2020
|Anti-explosion wall construction structure for main body structure connection
European Patent Office | 2024
|Explosion-proof door body and preparation method thereof
European Patent Office | 2023
|