The invention discloses an existing line reinforcing method in the special-shaped box culvert jacking process, and relates to the technical field of existing line reinforcing, and the existing line reinforcing method comprises the following steps that S1, a worker determines an area needing line reinforcing according to the requirement of a construction drawing; s2, special-shaped box culvert jacking construction preparation work is conducted according to the construction area; s3, the special-shaped box culvert is jacked after the preparation work is completed, and the existing line is reinforced in the jacking process; s4, existing lines in the jacking process are monitored in real time, and the special-shaped box culvert is treated and adjusted in time according to the monitoring result; and S5, after the special-shaped box culvert is jacked to the target position, final inspection and acceptance work is conducted. The method pays attention to research on a line reinforcement system, fully guarantees stable operation of trains and pipelines in the underpass construction process of the frame bridge, improves the safety and quality management level of a project, and provides a good guiding effect for subsequent similar projects.
本发明公开了一种异型箱涵顶进过程既有线路加固方法,涉及既有线路加固技术领域,包括以下步骤:S1、工作人员根据施工图纸要求确定需要进行线路加固的区域;S2、根据施工区域进行异型箱涵顶进施工准备工作;S3、在准备工作完成后进行异型箱涵顶进工作,并在顶进过程中对既有线路进行加固;S4、对顶进过程中的既有线路实时监测,根据监测结果对异型箱涵进行及时处理和调整;S5、当异型箱涵顶进至目标位置后,进行最终的检查和验收工作。本发明注重进行线路加固系统的研究,充分保障框架桥下穿施工过程中列车及管线的平稳运行,提高项目的安全、质量管理水平,为后续类似工程提供较好的指导作用。
Existing line reinforcing method in special-shaped box culvert jacking process
The invention discloses an existing line reinforcing method in the special-shaped box culvert jacking process, and relates to the technical field of existing line reinforcing, and the existing line reinforcing method comprises the following steps that S1, a worker determines an area needing line reinforcing according to the requirement of a construction drawing; s2, special-shaped box culvert jacking construction preparation work is conducted according to the construction area; s3, the special-shaped box culvert is jacked after the preparation work is completed, and the existing line is reinforced in the jacking process; s4, existing lines in the jacking process are monitored in real time, and the special-shaped box culvert is treated and adjusted in time according to the monitoring result; and S5, after the special-shaped box culvert is jacked to the target position, final inspection and acceptance work is conducted. The method pays attention to research on a line reinforcement system, fully guarantees stable operation of trains and pipelines in the underpass construction process of the frame bridge, improves the safety and quality management level of a project, and provides a good guiding effect for subsequent similar projects.
本发明公开了一种异型箱涵顶进过程既有线路加固方法,涉及既有线路加固技术领域,包括以下步骤:S1、工作人员根据施工图纸要求确定需要进行线路加固的区域;S2、根据施工区域进行异型箱涵顶进施工准备工作;S3、在准备工作完成后进行异型箱涵顶进工作,并在顶进过程中对既有线路进行加固;S4、对顶进过程中的既有线路实时监测,根据监测结果对异型箱涵进行及时处理和调整;S5、当异型箱涵顶进至目标位置后,进行最终的检查和验收工作。本发明注重进行线路加固系统的研究,充分保障框架桥下穿施工过程中列车及管线的平稳运行,提高项目的安全、质量管理水平,为后续类似工程提供较好的指导作用。
Existing line reinforcing method in special-shaped box culvert jacking process
一种异型箱涵顶进过程既有线路加固方法
ZHU HONGZHANG (author) / XIE WEIDONG (author) / HUANG MINGLI (author) / WANG WENZHENG (author) / LI ZILONG (author) / CHEN TAO (author) / ZHANG ZHENG (author) / DING BIN (author) / WANG GUOPAN (author) / LU YINGCHEN (author)
2024-01-02
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Jacking device and slab culvert reinforcing method adopting jacking device
European Patent Office | 2022
|Line reinforced structure in culvert jacking process under complex existing railway line
European Patent Office | 2016
|Railway underneath pass box culvert jacking rail reinforcing method
European Patent Office | 2021
|Construction technology of double-layer jacking culvert penetrating through existing line
European Patent Office | 2024
|Jack force transmission conversion frame and method in special-shaped box culvert jacking process
European Patent Office | 2024
|