A platform for research: civil engineering, architecture and urbanism
Construction technology of double-layer jacking culvert penetrating through existing line
The invention relates to the field of bridge and culvert construction, in particular to a construction technology of a double-layer jacking culvert penetrating through an existing line. S2, gradually jacking; s3, adjusting the position; and S4, the four steps of repeating jacking are conducted, when construction excavation needs to be conducted on the double-layer jacking culvert of the existing line, the supporting frame is installed firstly, the jacking assembly and the adjusting assembly are arranged on the supporting frame, after installation is completed, the jacking assembly is used for jacking the box culvert arranged on the supporting frame so as to complete jacking, and after jacking is conducted by a certain distance, the box culvert can be adjusted by the adjusting assembly. The position of the box culvert is adjusted through the adjusting assembly, jacking is conducted next time, jacking and adjusting are repeated, and construction can be efficiently completed. The bridge and culvert jacking device has the effect that the problem that in the prior art, a jack needs to be moved again to be fixed in the bridge and culvert jacking construction process, operation is tedious, and then the construction efficiency is seriously affected is solved to a certain extent.
本申请涉及桥涵施工领域,尤其是涉及一种穿越既有线的双层顶进涵施工工艺,包括S1、安装;S2、逐步顶进;S3、位置调节;S4、重复顶进,一共四个步骤,当要对既有线的双层顶进涵进行施工开挖时,首先安装好本申请的支撑架、在支撑架上设置有顶进组件和调节组件,安装好之后,使用顶进组件来对设置在支撑架上的箱涵进行顶进,以完成顶进,顶进一段距离之后,使用调节组件来调整箱涵的位置,一遍下一次的顶进,重复进行顶进、调整即可高效完成施工。本申请具有一定程度上解决了相关技术中桥涵顶进施工过程中需要重新移动千斤顶将千斤顶固定,操作繁琐,进而严重影响施工效率的问题的效果。
Construction technology of double-layer jacking culvert penetrating through existing line
The invention relates to the field of bridge and culvert construction, in particular to a construction technology of a double-layer jacking culvert penetrating through an existing line. S2, gradually jacking; s3, adjusting the position; and S4, the four steps of repeating jacking are conducted, when construction excavation needs to be conducted on the double-layer jacking culvert of the existing line, the supporting frame is installed firstly, the jacking assembly and the adjusting assembly are arranged on the supporting frame, after installation is completed, the jacking assembly is used for jacking the box culvert arranged on the supporting frame so as to complete jacking, and after jacking is conducted by a certain distance, the box culvert can be adjusted by the adjusting assembly. The position of the box culvert is adjusted through the adjusting assembly, jacking is conducted next time, jacking and adjusting are repeated, and construction can be efficiently completed. The bridge and culvert jacking device has the effect that the problem that in the prior art, a jack needs to be moved again to be fixed in the bridge and culvert jacking construction process, operation is tedious, and then the construction efficiency is seriously affected is solved to a certain extent.
本申请涉及桥涵施工领域,尤其是涉及一种穿越既有线的双层顶进涵施工工艺,包括S1、安装;S2、逐步顶进;S3、位置调节;S4、重复顶进,一共四个步骤,当要对既有线的双层顶进涵进行施工开挖时,首先安装好本申请的支撑架、在支撑架上设置有顶进组件和调节组件,安装好之后,使用顶进组件来对设置在支撑架上的箱涵进行顶进,以完成顶进,顶进一段距离之后,使用调节组件来调整箱涵的位置,一遍下一次的顶进,重复进行顶进、调整即可高效完成施工。本申请具有一定程度上解决了相关技术中桥涵顶进施工过程中需要重新移动千斤顶将千斤顶固定,操作繁琐,进而严重影响施工效率的问题的效果。
Construction technology of double-layer jacking culvert penetrating through existing line
一种穿越既有线的双层顶进涵施工工艺
ZHOU GUOTAO (author) / ZHANG CHENGMING (author) / WEI SHUAISHUAI (author) / ZHANG HUAQIANG (author) / WANG XIAOSHENG (author) / LI WEICHAO (author)
2024-06-25
Patent
Electronic Resource
Chinese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Steel beam penetrating device for reinforcing construction route of jacking culvert
European Patent Office | 2022
|Roadbed grouting reinforcement construction method in existing line bridge and culvert jacking range
European Patent Office | 2024
|Existing line reinforcing method in special-shaped box culvert jacking process
European Patent Office | 2024
|Line reinforced structure in culvert jacking process under complex existing railway line
European Patent Office | 2016
|