Prefabricating and assembling integral type construction method for independent foundation combined with foundation beam
The invention discloses a prefabricated integral construction method for an independent foundation combined with a foundation beam. The method mainly comprises the following steps: 1) firstly prefabricating an independent foundation in a factory or a prefabricating field; (2) independent foundation positioning and paying-off are conducted, a foundation pit is excavated, after a concrete cushion layer is poured, M20 cement paste is laid on the cushion layer, and prefabricated independent foundation installation is conducted; (3) foundation beam or formwork installation and steel bar installation are conducted, and during installation, foundation beam steel bars need to be anchored in the prefabricated independent foundation or connected with reserved steel bars of the prefabricated independent foundation; according to the mode, operation is easy, convenient and rapid, advanced intervention of the construction process of the independent foundation can be achieved, the foundation pit exposure time is shortened, the construction period is shortened, meanwhile, factory manufacturing of the independent foundation can be achieved, cost is saved, and quality is easily guaranteed.
本发明公开了一种与基础梁相结合的独立基础预制装配整体式施工方法;主要做法如下:1)首先在工厂或预制场预制独立基础;2)进行独立基础定位放线、开挖基坑、浇筑混凝土垫层后,在垫层上铺M20的水泥净浆并进行预制独立基础安装;3)进行基础梁或模板安装、钢筋安装,但安装时需将基础梁钢筋锚固在预制独立基础内,或与预制独立基础的预留钢筋相连;4)浇筑基础梁及独立基础与基础梁锚固区域的混凝土。该种方式操作简便快捷,可实现独立基础施工过程的提前介入,减少基坑裸露时间,缩短工期。同时可实现独立基础工厂化制作,既节约成本,还容易保证质量。
Prefabricating and assembling integral type construction method for independent foundation combined with foundation beam
The invention discloses a prefabricated integral construction method for an independent foundation combined with a foundation beam. The method mainly comprises the following steps: 1) firstly prefabricating an independent foundation in a factory or a prefabricating field; (2) independent foundation positioning and paying-off are conducted, a foundation pit is excavated, after a concrete cushion layer is poured, M20 cement paste is laid on the cushion layer, and prefabricated independent foundation installation is conducted; (3) foundation beam or formwork installation and steel bar installation are conducted, and during installation, foundation beam steel bars need to be anchored in the prefabricated independent foundation or connected with reserved steel bars of the prefabricated independent foundation; according to the mode, operation is easy, convenient and rapid, advanced intervention of the construction process of the independent foundation can be achieved, the foundation pit exposure time is shortened, the construction period is shortened, meanwhile, factory manufacturing of the independent foundation can be achieved, cost is saved, and quality is easily guaranteed.
本发明公开了一种与基础梁相结合的独立基础预制装配整体式施工方法;主要做法如下:1)首先在工厂或预制场预制独立基础;2)进行独立基础定位放线、开挖基坑、浇筑混凝土垫层后,在垫层上铺M20的水泥净浆并进行预制独立基础安装;3)进行基础梁或模板安装、钢筋安装,但安装时需将基础梁钢筋锚固在预制独立基础内,或与预制独立基础的预留钢筋相连;4)浇筑基础梁及独立基础与基础梁锚固区域的混凝土。该种方式操作简便快捷,可实现独立基础施工过程的提前介入,减少基坑裸露时间,缩短工期。同时可实现独立基础工厂化制作,既节约成本,还容易保证质量。
Prefabricating and assembling integral type construction method for independent foundation combined with foundation beam
与基础梁相结合的独立基础预制装配整体式施工方法
LI YONGAN (author) / MA JIUQING (author) / DONG LIANG (author) / LIN XING (author) / CHEN HAORAN (author)
2024-01-02
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Reversed sill prefabricating and assembling construction method
European Patent Office | 2023
|Prefabricating device used before pile foundation pouring
European Patent Office | 2021
|Continuous beam segment prefabricating and assembling method
European Patent Office | 2021
|European Patent Office | 2024
|Pipe gallery prefabricating and assembling construction technology
European Patent Office | 2024
|