A platform for research: civil engineering, architecture and urbanism
Roof opening reinforcing and plugging method
The invention relates to a roof opening reinforcing and blocking method which comprises the steps that two pieces of first channel steel are arranged between two roof beams on the edge of an opening, and the two pieces of first channel steel are arranged on the two sides of the lower portion of the opening respectively along the gradient; two pieces of second channel steel are arranged and fixed between the first channel steel, the two pieces of second channel steel are supported between the two pieces of first channel steel, and the second channel steel are arranged at the two ends of the lower portion of the hole correspondingly; a plurality of first purlines are arranged below the roof hole edge bottom plate, and supporting structures are arranged between the first purlines and the first channel steel to fix the first purlines; a fence structure is arranged on the periphery of a roof hole, and an additional folding piece is laid above the fence structure to cover the hole. According to the method for reinforcing and blocking the roof opening, the original structure of the opening is reinforced through the first steel channel and the second steel channel, the first purline is additionally arranged on the bottom plate on the edge of the opening, it can be guaranteed that the roof does not warp down, the stability of the opening is guaranteed, the fence structure is additionally arranged, the flashing height of the roof opening is increased, and the rainwater influence is reduced.
本发明涉及一种屋面洞口加固及封堵的方法,包括:在洞口边缘两个屋面梁之间设置两个第一槽钢,且将两个第一槽钢沿着坡度分别设置于洞口下方两侧;在第一槽钢之间设置并固定两个第二槽钢,将两个第二槽钢支撑于两个第一槽钢之间,且将第二槽钢分别设置于洞口下方两端;在屋面洞口边底板下方设置多个第一檩条,并在第一檩条与第一槽钢之间设置支撑结构固定第一檩条;在屋面洞口周边设置围挡结构,并在围挡结构的上方铺设附加折件遮盖洞口。本发明一种屋面洞口加固及封堵的方法中,通过第一槽钢和第二槽钢对洞口原结构进行加固,再对洞口边底板增设第一檩条可以保证屋面不下挠,保证了洞口稳定,增设围挡结构提高屋面洞口泛水高度,减小雨水影响。
Roof opening reinforcing and plugging method
The invention relates to a roof opening reinforcing and blocking method which comprises the steps that two pieces of first channel steel are arranged between two roof beams on the edge of an opening, and the two pieces of first channel steel are arranged on the two sides of the lower portion of the opening respectively along the gradient; two pieces of second channel steel are arranged and fixed between the first channel steel, the two pieces of second channel steel are supported between the two pieces of first channel steel, and the second channel steel are arranged at the two ends of the lower portion of the hole correspondingly; a plurality of first purlines are arranged below the roof hole edge bottom plate, and supporting structures are arranged between the first purlines and the first channel steel to fix the first purlines; a fence structure is arranged on the periphery of a roof hole, and an additional folding piece is laid above the fence structure to cover the hole. According to the method for reinforcing and blocking the roof opening, the original structure of the opening is reinforced through the first steel channel and the second steel channel, the first purline is additionally arranged on the bottom plate on the edge of the opening, it can be guaranteed that the roof does not warp down, the stability of the opening is guaranteed, the fence structure is additionally arranged, the flashing height of the roof opening is increased, and the rainwater influence is reduced.
本发明涉及一种屋面洞口加固及封堵的方法,包括:在洞口边缘两个屋面梁之间设置两个第一槽钢,且将两个第一槽钢沿着坡度分别设置于洞口下方两侧;在第一槽钢之间设置并固定两个第二槽钢,将两个第二槽钢支撑于两个第一槽钢之间,且将第二槽钢分别设置于洞口下方两端;在屋面洞口边底板下方设置多个第一檩条,并在第一檩条与第一槽钢之间设置支撑结构固定第一檩条;在屋面洞口周边设置围挡结构,并在围挡结构的上方铺设附加折件遮盖洞口。本发明一种屋面洞口加固及封堵的方法中,通过第一槽钢和第二槽钢对洞口原结构进行加固,再对洞口边底板增设第一檩条可以保证屋面不下挠,保证了洞口稳定,增设围挡结构提高屋面洞口泛水高度,减小雨水影响。
Roof opening reinforcing and plugging method
一种屋面洞口加固及封堵的方法
WANG XIANLI (author) / ZHONG RONGYAO (author) / CHEN WEICHAO (author) / YU HAO (author) / LI LIANGLIANG (author) / NI LILI (author)
2024-01-02
Patent
Electronic Resource
Chinese
Reinforcing structure and reinforcing method for reinforced concrete roof opening and building
European Patent Office | 2022
|Plugging and reinforcing device for rear opening of civil air defense wall
European Patent Office | 2024
|Roof opening reverse ridge anti-seepage reinforcing structure and method
European Patent Office | 2023
|