A platform for research: civil engineering, architecture and urbanism
Prefabricated assembled concrete-filled steel tube pier
The invention relates to the technical field of bridge pier splicing, and discloses a prefabricated spliced concrete filled steel tube bridge pier which comprises a plurality of prefabricated splicing sections, and a connecting assembly is mounted between every two adjacent splicing sections; at least two positioning balls are arranged on the end face of one end of the splicing section in a rolling mode, positioning grooves used for containing the positioning balls are formed in the end face of the other end of the splicing section, the positioning grooves are correspondingly formed according to the number of the positioning balls, and a supporting plate is detachably installed on the splicing section. The supporting plates are distributed in the circumferential direction of the splicing section, and the supporting plates are close to the ends, provided with the positioning grooves, of the splicing section. The splicing time of the splicing sections can be shortened to a great extent.
本申请涉及桥墩拼装的技术领域,公开了一种预制拼装钢管混凝土桥墩,包括多个预制好的拼接段,相邻两所述拼接段之间安装有连接组件;所述拼接段的一端端面滚动设置有定位滚珠,所述定位滚珠至少有两个,所述拼接段的另一端端面设置有用于容纳所述定位滚珠的定位槽,所述定位槽根据所述定位滚珠的数量对应设置,所述拼接段上可拆卸安装有支撑板,所述支撑板沿所述拼接段的周向分布,所述支撑板靠近所述拼接段具有定位槽的一端处。本申请能够较大程度地缩短拼接段拼装的时间。
Prefabricated assembled concrete-filled steel tube pier
The invention relates to the technical field of bridge pier splicing, and discloses a prefabricated spliced concrete filled steel tube bridge pier which comprises a plurality of prefabricated splicing sections, and a connecting assembly is mounted between every two adjacent splicing sections; at least two positioning balls are arranged on the end face of one end of the splicing section in a rolling mode, positioning grooves used for containing the positioning balls are formed in the end face of the other end of the splicing section, the positioning grooves are correspondingly formed according to the number of the positioning balls, and a supporting plate is detachably installed on the splicing section. The supporting plates are distributed in the circumferential direction of the splicing section, and the supporting plates are close to the ends, provided with the positioning grooves, of the splicing section. The splicing time of the splicing sections can be shortened to a great extent.
本申请涉及桥墩拼装的技术领域,公开了一种预制拼装钢管混凝土桥墩,包括多个预制好的拼接段,相邻两所述拼接段之间安装有连接组件;所述拼接段的一端端面滚动设置有定位滚珠,所述定位滚珠至少有两个,所述拼接段的另一端端面设置有用于容纳所述定位滚珠的定位槽,所述定位槽根据所述定位滚珠的数量对应设置,所述拼接段上可拆卸安装有支撑板,所述支撑板沿所述拼接段的周向分布,所述支撑板靠近所述拼接段具有定位槽的一端处。本申请能够较大程度地缩短拼接段拼装的时间。
Prefabricated assembled concrete-filled steel tube pier
一种预制拼装钢管混凝土桥墩
WU YIXIAN (author) / CHEN KANGMING (author) / QIU CHENG (author) / LIU JUN (author) / HUANG DAOQIAN (author)
2024-01-05
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Replaceable hollow double-wall concrete-filled steel tube prefabricated assembled pier
European Patent Office | 2020
|Prefabricated and assembled railway pier structure based on concrete-filled steel tube framework
European Patent Office | 2024
|Prefabricated segment assembled hollow steel tube-reinforced concrete combined pier
European Patent Office | 2023
|