Construction method of frame-core tube building structure
The invention relates to a construction method of a frame-core tube building structure, which is characterized in that recoverable cooling pipes penetrate through a template, and the two ends of the adjacent recoverable cooling pipes are connected by using bent pipes, so that the bent parts of the recoverable cooling pipes are positioned on the outer side of concrete, and the vertical ends of the recoverable cooling pipes are positioned on the inner side of the concrete, and the cooling pipes can be better separated from the concrete; the recyclable cooling pipe can be repeatedly used, the construction cost of a project is greatly reduced, meanwhile, through the arrangement of the water flowing pipe and the middle pipe, the water flowing pipe is firstly pulled out from the interior of the middle pipe, then the nail pieces are sequentially knocked, the nail pieces are bent at a micro angle, and then the nail pieces are separated from the structural holes and taken out through an iron shovel. The middle pipe in contact with concrete is divided into a plurality of sections, and the sections are sequentially detached, so that the adhesive force between the single armor piece and the concrete can be reduced, the middle pipe can be detached more easily, and the situation that the middle pipe cannot be taken out of the concrete is avoided.
本发明涉及一种框架‑核心筒建筑结构的施工方法,通过将可回收冷却管穿过模板,且相邻可回收冷却管的两端使用弯管连接的设置,使可回收冷却管的弯折处位于混凝土的外侧,竖直端位于混凝土的内侧,则冷却管能更好的脱离混凝土,使可回收冷却管能重复使用,大大降低了工程的造价成本,同时通过走水管和中间管的设置,先将走水管从中间管的内部抽出,然后依次敲击多片甲片,并使甲片微角度弯折,再使用铁铲使甲片与结构孔分离取出,通过上述设置,将与混凝土接触的中间管分为多段,依次的拆除,就可降低单个甲片与混凝土之间的粘黏力,使中间管能更容易被拆下,避免出现中间管无法从混凝土中取出的情况出现。
Construction method of frame-core tube building structure
The invention relates to a construction method of a frame-core tube building structure, which is characterized in that recoverable cooling pipes penetrate through a template, and the two ends of the adjacent recoverable cooling pipes are connected by using bent pipes, so that the bent parts of the recoverable cooling pipes are positioned on the outer side of concrete, and the vertical ends of the recoverable cooling pipes are positioned on the inner side of the concrete, and the cooling pipes can be better separated from the concrete; the recyclable cooling pipe can be repeatedly used, the construction cost of a project is greatly reduced, meanwhile, through the arrangement of the water flowing pipe and the middle pipe, the water flowing pipe is firstly pulled out from the interior of the middle pipe, then the nail pieces are sequentially knocked, the nail pieces are bent at a micro angle, and then the nail pieces are separated from the structural holes and taken out through an iron shovel. The middle pipe in contact with concrete is divided into a plurality of sections, and the sections are sequentially detached, so that the adhesive force between the single armor piece and the concrete can be reduced, the middle pipe can be detached more easily, and the situation that the middle pipe cannot be taken out of the concrete is avoided.
本发明涉及一种框架‑核心筒建筑结构的施工方法,通过将可回收冷却管穿过模板,且相邻可回收冷却管的两端使用弯管连接的设置,使可回收冷却管的弯折处位于混凝土的外侧,竖直端位于混凝土的内侧,则冷却管能更好的脱离混凝土,使可回收冷却管能重复使用,大大降低了工程的造价成本,同时通过走水管和中间管的设置,先将走水管从中间管的内部抽出,然后依次敲击多片甲片,并使甲片微角度弯折,再使用铁铲使甲片与结构孔分离取出,通过上述设置,将与混凝土接触的中间管分为多段,依次的拆除,就可降低单个甲片与混凝土之间的粘黏力,使中间管能更容易被拆下,避免出现中间管无法从混凝土中取出的情况出现。
Construction method of frame-core tube building structure
一种框架-核心筒建筑结构的施工方法
FENG YULONG (author) / YANG QINGWEI (author) / SHEN PENGFEI (author) / ZHENG YULEI (author) / SUN HAIFENG (author)
2024-01-05
Patent
Electronic Resource
Chinese
Braced frame-core tube building structure and construction method thereof
European Patent Office | 2021
|Hollow core tube structure system of high-rise building frame
European Patent Office | 2015
|BUILDING FRAME, BUILDING FRAME STRUCTURE, BUILDING PANEL STRUCTURE, BUILDING CONSTRUCTION METHOD
European Patent Office | 2019
|