A platform for research: civil engineering, architecture and urbanism
The invention discloses an external wall thermal insulation integrated board mounting method which comprises the following steps: S1, assembling two prefabricated keels and two prefabricated cross beams to form a complete rectangular frame; s2, the completely assembled rectangular frame is fixed to the back face of the heat preservation integrated board; s3, the heat preservation integrated board is transported to a construction site, hanging lugs are fixed to the surfaces of the two keels, and a heat preservation integrated board installation unit is formed; and S4, a fixing mechanism is installed at a punching position on the outer side of the building wall surface according to the site condition. After the installation method is selected, the heat preservation integrated board and the rectangular frame are stressed cooperatively, the section can be reduced to the maximum extent, and materials are saved; the factory prefabrication degree is high, the processing quality is easy to control, and the installation of the thermal insulation integrated board is also facilitated.
本发明公开了一种外墙保温集成板安装方法,包括如下步骤:一种外墙保温集成板安装方法,包括如下步骤:S1:将预制好的两根龙骨及两根横梁组装形成完整的矩形框架;S2:将组装完整的矩形框架固定在保温集成板的背面;S3:将保温集成板运输至施工现场并在两根龙骨的表面固定上挂耳,形成保温集成板安装单元;S4:根据现场情况在建筑物墙面外侧的打孔位置,在打孔位置处安装固定机构。本申请选用这安装方法后保温集成板与矩形框架协同受力,可以最大限度的减小截面,节省材料;工厂化预制程度高,加工质量易于控制,也方便了保温集成板的安装。
The invention discloses an external wall thermal insulation integrated board mounting method which comprises the following steps: S1, assembling two prefabricated keels and two prefabricated cross beams to form a complete rectangular frame; s2, the completely assembled rectangular frame is fixed to the back face of the heat preservation integrated board; s3, the heat preservation integrated board is transported to a construction site, hanging lugs are fixed to the surfaces of the two keels, and a heat preservation integrated board installation unit is formed; and S4, a fixing mechanism is installed at a punching position on the outer side of the building wall surface according to the site condition. After the installation method is selected, the heat preservation integrated board and the rectangular frame are stressed cooperatively, the section can be reduced to the maximum extent, and materials are saved; the factory prefabrication degree is high, the processing quality is easy to control, and the installation of the thermal insulation integrated board is also facilitated.
本发明公开了一种外墙保温集成板安装方法,包括如下步骤:一种外墙保温集成板安装方法,包括如下步骤:S1:将预制好的两根龙骨及两根横梁组装形成完整的矩形框架;S2:将组装完整的矩形框架固定在保温集成板的背面;S3:将保温集成板运输至施工现场并在两根龙骨的表面固定上挂耳,形成保温集成板安装单元;S4:根据现场情况在建筑物墙面外侧的打孔位置,在打孔位置处安装固定机构。本申请选用这安装方法后保温集成板与矩形框架协同受力,可以最大限度的减小截面,节省材料;工厂化预制程度高,加工质量易于控制,也方便了保温集成板的安装。
Installation method of external wall heat insulation integrated board
一种外墙保温集成板安装方法
2024-01-09
Patent
Electronic Resource
Chinese
Installation method of external wall heat insulation integrated board
European Patent Office | 2023
|Building external wall insulation board installation construction method
European Patent Office | 2021
|Installation construction method of external wall insulation board
European Patent Office | 2021
|Reinforcing assembly of external wall insulation board and installation method
European Patent Office | 2022
|Auxiliary installation device for building external wall insulation board
European Patent Office | 2024
|