The invention discloses a toilet drainage pipeline construction method, and relates to the technical field of building construction, and the toilet drainage pipeline construction method comprises the following steps: S1, settlement treatment: downwards forming a settling tank in the ground of a toilet; s2, the old pipeline is dismantled, specifically, the old pipeline in the existing structure is dismantled, an old main pipeline is cut, and an upper connector and a lower connector are reserved; s3, a new main pipeline is installed, wherein the new main pipeline comprises a drainage main pipeline and a reducing tee joint; the top end of the drainage main pipeline is communicated with the upper interface; an upper opening of the reducing tee is communicated with the bottom end of the drainage main pipeline; a lower opening of the reducing tee joint is communicated with the lower interface; s4, auxiliary drainage pipeline installation, wherein the auxiliary drainage pipeline communicates with a transverse opening of the variable-diameter tee joint, and corresponding drainage pipeline arrangement is completed according to the planned pipeline trend and distance; s5, waterproof layer treatment; S6, backfilling treatment; s7, decoration treatment; according to the invention, the existing structure is transformed, the construction process is simple, the drainage effect is good, and the space utilization rate of the toilet is effectively improved.
本发明公开了一种卫生间排水管路施工方法,涉及建筑施工技术领域,包括以下步骤:S1、沉降处理:在卫生间地面向下开设沉降槽;S2、旧管路拆除:将既有结构中的旧管路拆除,切割旧主管路,并预留上接口和下接口;S3、新主管路安装:新主管路包括排水主管路和变径三通;排水主管路的顶端与上接口连通;变径三通的上口与排水主管路的底端连通;变径三通的下口与下接口连通;S4、排水辅管路安装:排水辅管路与变径三通的横口连通,并按照规划的管路走向及距离完成相应的排水管路排布;S5、防水层处理:S6、回填处理;S7、装饰处理;在回填层上表面铺设装饰层,本发明在既有结构中进行改造,施工过程简单,排水效果好,有效提升卫生间空间利用率。
The invention discloses a toilet drainage pipeline construction method, and relates to the technical field of building construction, and the toilet drainage pipeline construction method comprises the following steps: S1, settlement treatment: downwards forming a settling tank in the ground of a toilet; s2, the old pipeline is dismantled, specifically, the old pipeline in the existing structure is dismantled, an old main pipeline is cut, and an upper connector and a lower connector are reserved; s3, a new main pipeline is installed, wherein the new main pipeline comprises a drainage main pipeline and a reducing tee joint; the top end of the drainage main pipeline is communicated with the upper interface; an upper opening of the reducing tee is communicated with the bottom end of the drainage main pipeline; a lower opening of the reducing tee joint is communicated with the lower interface; s4, auxiliary drainage pipeline installation, wherein the auxiliary drainage pipeline communicates with a transverse opening of the variable-diameter tee joint, and corresponding drainage pipeline arrangement is completed according to the planned pipeline trend and distance; s5, waterproof layer treatment; S6, backfilling treatment; s7, decoration treatment; according to the invention, the existing structure is transformed, the construction process is simple, the drainage effect is good, and the space utilization rate of the toilet is effectively improved.
本发明公开了一种卫生间排水管路施工方法,涉及建筑施工技术领域,包括以下步骤:S1、沉降处理:在卫生间地面向下开设沉降槽;S2、旧管路拆除:将既有结构中的旧管路拆除,切割旧主管路,并预留上接口和下接口;S3、新主管路安装:新主管路包括排水主管路和变径三通;排水主管路的顶端与上接口连通;变径三通的上口与排水主管路的底端连通;变径三通的下口与下接口连通;S4、排水辅管路安装:排水辅管路与变径三通的横口连通,并按照规划的管路走向及距离完成相应的排水管路排布;S5、防水层处理:S6、回填处理;S7、装饰处理;在回填层上表面铺设装饰层,本发明在既有结构中进行改造,施工过程简单,排水效果好,有效提升卫生间空间利用率。
Toilet drainage pipeline construction method
一种卫生间排水管路施工方法
LI BAOGUO (author)
2024-01-12
Patent
Electronic Resource
Chinese
Toilet drainage pipeline and construction method thereof
European Patent Office | 2024
|Toilet drainage pipeline system and same-floor drainage toilet
European Patent Office | 2021
Odor-resistant toilet drainage pipeline connecting device
European Patent Office | 2022
|