A platform for research: civil engineering, architecture and urbanism
Construction process of reinforced slope
The invention discloses a construction process of a reinforced slope, belongs to the technical field of reinforced structures, and aims to solve at least one of the problems that in the prior art, lateral soil pressure generated by a reinforced soil body of a reinforced soil structure directly acts on a slope protection layer, so that the slope protection layer horizontally deforms, and the reinforcement effect of a reinforced material is insufficient. The process comprises the steps that a reinforced bottom layer is laid, and steps and grooves are formed in the upper surface of the reinforced bottom layer; the L-shaped mesh is arranged at the end, away from the existing abrupt slope, of the reinforced bottom layer, and a layer of reinforced material is laid flatly; a geobag assembly is formed at the end, away from the existing abrupt slope, of the reinforced material; reversely wrapping the reserved part of the reinforced material on the geobag assembly; a stone matching assembly is formed between the soilbag assembly and the L-shaped meshes, a reinforced inner layer is obtained, and steps and grooves are formed in the upper surface of the reinforced inner layer. The method can be used for construction of the reinforced slope.
本发明公开了一种加筋边坡的施工工艺,属于加筋结构技术领域,用以解决现有技术中加筋土结构加筋土体产生的侧向土压力直接作用于坡面保护层导致坡面保护层发生水平变形、加筋材料加筋效果不足中的至少一个问题。该工艺包括铺设加筋底层,并在加筋底层的上表面形成台阶和凹槽;将L型网片置于加筋底层远离既有陡坡的一端,平铺一层加筋材料;在加筋材料远离既有陡坡一端形成土工袋组件;将预留的部分加筋材料反包于土工袋组件上;在土工袋组件与L型网片之间形成配石组件,得到一层加筋内层,在加筋内层的上表面形成台阶和凹槽。本发明可用于加筋边坡的施工。
Construction process of reinforced slope
The invention discloses a construction process of a reinforced slope, belongs to the technical field of reinforced structures, and aims to solve at least one of the problems that in the prior art, lateral soil pressure generated by a reinforced soil body of a reinforced soil structure directly acts on a slope protection layer, so that the slope protection layer horizontally deforms, and the reinforcement effect of a reinforced material is insufficient. The process comprises the steps that a reinforced bottom layer is laid, and steps and grooves are formed in the upper surface of the reinforced bottom layer; the L-shaped mesh is arranged at the end, away from the existing abrupt slope, of the reinforced bottom layer, and a layer of reinforced material is laid flatly; a geobag assembly is formed at the end, away from the existing abrupt slope, of the reinforced material; reversely wrapping the reserved part of the reinforced material on the geobag assembly; a stone matching assembly is formed between the soilbag assembly and the L-shaped meshes, a reinforced inner layer is obtained, and steps and grooves are formed in the upper surface of the reinforced inner layer. The method can be used for construction of the reinforced slope.
本发明公开了一种加筋边坡的施工工艺,属于加筋结构技术领域,用以解决现有技术中加筋土结构加筋土体产生的侧向土压力直接作用于坡面保护层导致坡面保护层发生水平变形、加筋材料加筋效果不足中的至少一个问题。该工艺包括铺设加筋底层,并在加筋底层的上表面形成台阶和凹槽;将L型网片置于加筋底层远离既有陡坡的一端,平铺一层加筋材料;在加筋材料远离既有陡坡一端形成土工袋组件;将预留的部分加筋材料反包于土工袋组件上;在土工袋组件与L型网片之间形成配石组件,得到一层加筋内层,在加筋内层的上表面形成台阶和凹槽。本发明可用于加筋边坡的施工。
Construction process of reinforced slope
一种加筋边坡的施工工艺
ZHANG HONGBIN (author) / YANG GUANGQING (author) / SU PENGHUI (author) / WANG YONG (author) / ZHANG JIANZHONG (author) / YANG XUFENG (author) / LI QINGUANG (author) / MA TIANCHANG (author) / XU PENG (author) / LIU JUN (author)
2024-01-23
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Reinforced soil slope design and construction
British Library Online Contents | 2016
|European Patent Office | 2023
|Reinforced soil abrupt slope and construction method thereof
European Patent Office | 2024
|Reinforced soil slope structure and construction method thereof
European Patent Office | 2023
|