Slope support construction process
The invention relates to a slope support construction technology, and relates to the technical field of slope support, and the construction technology comprises the following steps: determining a hole site; drilling an initial hole: drilling to obtain the initial hole, wherein the diameter of the initial hole is smaller than that of the mounting hole; forming a mounting hole: extruding and reaming the initial hole through an extruding device to form the mounting hole; anchor rods are mounted, specifically, the anchor rods are mounted in the mounting holes; grouting is conducted, specifically, grouting is conducted in the mounting holes to fix the anchor rods; frame beams are manufactured, wherein the protection frames are connected with the anchor rods; and pouring the lattice beam: pouring the protective frame and the anchor rod to form the lattice beam. According to the device, soil in a mounting hole is compact and stable through the extrusion mechanism, hole cleaning work after drilling is also achieved, meanwhile, compared with the size directly achieved through drilling, the size of the mounting hole formed after extrusion of the extrusion mechanism is more accurate, and therefore the construction efficiency and the protection effect of a slope supporting facility are improved.
本申请涉及边坡支护施工工艺,涉及边坡支护的技术领域,施工工艺包括以下步骤:确定孔位;钻取初始孔:钻孔得到初始孔,初始孔直径小于安装孔直径;成型安装孔:通过挤压装置对初始孔进行挤压扩孔后形成安装孔;安装锚杆:将锚杆安装到安装孔内;注浆:向安装孔内注浆而固定锚杆;制作框架梁:将防护架与锚杆连接;浇筑格构梁:浇注防护架和锚杆形成格构梁。本申请通过挤压机构实现安装孔内泥土紧实稳定,而且也实现了对钻孔后的清孔工作,同时相对于直接通过钻孔实现的尺寸,挤压机构进行挤压后形成的安装孔尺寸更加准确,从而提高了边坡支护设施的施工效率和防护效果。
Slope support construction process
The invention relates to a slope support construction technology, and relates to the technical field of slope support, and the construction technology comprises the following steps: determining a hole site; drilling an initial hole: drilling to obtain the initial hole, wherein the diameter of the initial hole is smaller than that of the mounting hole; forming a mounting hole: extruding and reaming the initial hole through an extruding device to form the mounting hole; anchor rods are mounted, specifically, the anchor rods are mounted in the mounting holes; grouting is conducted, specifically, grouting is conducted in the mounting holes to fix the anchor rods; frame beams are manufactured, wherein the protection frames are connected with the anchor rods; and pouring the lattice beam: pouring the protective frame and the anchor rod to form the lattice beam. According to the device, soil in a mounting hole is compact and stable through the extrusion mechanism, hole cleaning work after drilling is also achieved, meanwhile, compared with the size directly achieved through drilling, the size of the mounting hole formed after extrusion of the extrusion mechanism is more accurate, and therefore the construction efficiency and the protection effect of a slope supporting facility are improved.
本申请涉及边坡支护施工工艺,涉及边坡支护的技术领域,施工工艺包括以下步骤:确定孔位;钻取初始孔:钻孔得到初始孔,初始孔直径小于安装孔直径;成型安装孔:通过挤压装置对初始孔进行挤压扩孔后形成安装孔;安装锚杆:将锚杆安装到安装孔内;注浆:向安装孔内注浆而固定锚杆;制作框架梁:将防护架与锚杆连接;浇筑格构梁:浇注防护架和锚杆形成格构梁。本申请通过挤压机构实现安装孔内泥土紧实稳定,而且也实现了对钻孔后的清孔工作,同时相对于直接通过钻孔实现的尺寸,挤压机构进行挤压后形成的安装孔尺寸更加准确,从而提高了边坡支护设施的施工效率和防护效果。
Slope support construction process
边坡支护施工工艺
ZHANG ZHICHENG (author) / LUO JIA (author) / QIN KUN (author) / ZHU YUEZHENG (author)
2024-11-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen