Waist beam anchor cable pedestal for piled-anchor support, piled-anchor support and pedestal mounting method
The invention provides a waist beam anchor cable pedestal for a piled-anchor support, the piled-anchor support and a pedestal mounting method. The pedestal comprises a first steel plate, a plurality of second steel plates and a bearing plate, and one end of the first steel plate is connected with the end face of a combined steel waist beam; one end of each second steel plate is connected with the other end of the first steel plate; one end of the bearing plate is connected with the other ends of the second steel plates, and the anchor cable vertically penetrates through the bearing plate and extends into the pile through the first steel plate; the bearing plate and the pile are arranged in a vertical included angle mode, and the connecting position of the anchor cable and the bearing plate is higher than the connecting position of the anchor cable and the first steel plate. According to the waist beam anchor cable pedestal for the pile-anchor support, the steel waist beam can still be used when the prestress is large, the pedestal is convenient to install and beneficial to batch machining, the steel waist beam can be directly installed after being installed in place, the internal welding procedure of the pedestal can be completed before installation, and the construction period is not affected.
本发明提供一种用于桩锚支护中腰梁锚索台座、桩锚支护及台座安装方法,台座包括:第一钢板、多个第二钢板以及承压板,第一钢板一端与组合钢腰梁的端面连接;多个第二钢板的一端与第一钢板的另一端相连接;承压板一端与多个第二钢板的另一端相连接,锚索垂直穿过承压板经第一钢板延伸至桩内;其中,承压板与桩的竖向夹角设置,锚索与承压板的连接位置高于锚索与第一钢板的连接位置。本发明用于桩锚支护中腰梁锚索台座,用于在预应力较大时,仍可以使用钢腰梁,而且本发明的台座安装方便,且有利于批量化加工,在钢腰梁安装就位后,即可直接进行安装,台座内部焊接工序均可以在安装前完成,对工期无影响。
Waist beam anchor cable pedestal for piled-anchor support, piled-anchor support and pedestal mounting method
The invention provides a waist beam anchor cable pedestal for a piled-anchor support, the piled-anchor support and a pedestal mounting method. The pedestal comprises a first steel plate, a plurality of second steel plates and a bearing plate, and one end of the first steel plate is connected with the end face of a combined steel waist beam; one end of each second steel plate is connected with the other end of the first steel plate; one end of the bearing plate is connected with the other ends of the second steel plates, and the anchor cable vertically penetrates through the bearing plate and extends into the pile through the first steel plate; the bearing plate and the pile are arranged in a vertical included angle mode, and the connecting position of the anchor cable and the bearing plate is higher than the connecting position of the anchor cable and the first steel plate. According to the waist beam anchor cable pedestal for the pile-anchor support, the steel waist beam can still be used when the prestress is large, the pedestal is convenient to install and beneficial to batch machining, the steel waist beam can be directly installed after being installed in place, the internal welding procedure of the pedestal can be completed before installation, and the construction period is not affected.
本发明提供一种用于桩锚支护中腰梁锚索台座、桩锚支护及台座安装方法,台座包括:第一钢板、多个第二钢板以及承压板,第一钢板一端与组合钢腰梁的端面连接;多个第二钢板的一端与第一钢板的另一端相连接;承压板一端与多个第二钢板的另一端相连接,锚索垂直穿过承压板经第一钢板延伸至桩内;其中,承压板与桩的竖向夹角设置,锚索与承压板的连接位置高于锚索与第一钢板的连接位置。本发明用于桩锚支护中腰梁锚索台座,用于在预应力较大时,仍可以使用钢腰梁,而且本发明的台座安装方便,且有利于批量化加工,在钢腰梁安装就位后,即可直接进行安装,台座内部焊接工序均可以在安装前完成,对工期无影响。
Waist beam anchor cable pedestal for piled-anchor support, piled-anchor support and pedestal mounting method
用于桩锚支护中腰梁锚索台座、桩锚支护及台座安装方法
GU SHENGQUAN (author) / YU XIAOMEI (author) / PENG XIAOPING (author) / XIE CHENGDONG (author) / YANG SHIFENG (author)
2024-01-26
Patent
Electronic Resource
Chinese