A platform for research: civil engineering, architecture and urbanism
The invention discloses a building unit plate outer wall construction process which comprises the steps of cleaning the surface of an outer wall, determining the position of a rear embedded part, installing a unit plate adapter, installing a unit plate hanger, adjusting the unit plate in the vertical and horizontal directions, inserting a core into the unit plate and injecting glue, hoisting an upper layer plate, and inspecting the outer wall through a temporary fixing device. The clamping plate can make close contact with the wall, the friction between the clamping plate and the wall can be improved through the anti-skid block, the supporting plate can be stably installed on the wall, use of a rope is facilitated, construction personnel can conveniently work on the outer wall, meanwhile, the wall does not need to be punched, the use difficulty can be reduced, the applicability is improved, and the construction efficiency is improved. Secondary damage to the wall body can be avoided, meanwhile, dismounting, mounting and using are convenient, constructors can conveniently adjust the distance between the rope and the outer wall body by controlling extension and shortening of the electric telescopic rod, and construction of the constructors can be facilitated.
本发明公开了一种建筑单元板块外墙施工工艺,包括将外墙的表面清理干净、确定后置埋件位置、单元板块转接件安装、单元板块吊安装、单元板块垂直水平方向调整、单元板块插芯注胶、上层板块吊装、通过临时固定装置,对外墙进行检验。本发明能够使夹持板与墙体紧密接触,且防滑块能够提高夹持板与墙体之间的摩擦,能够使支撑板稳定安装在墙体上,有利于绳子的使用,方便施工人员在外墙作业,同时本方案不用对墙体进行打孔,能够降低使用难度,提高适用性,能够避免墙体二次受损,同时方便拆卸与安装,方便使用,通过控制电动伸缩杆的伸长与缩短,方便施工人员调节绳子距离外墙墙体之间的距离,能够方便施工人员施工。
The invention discloses a building unit plate outer wall construction process which comprises the steps of cleaning the surface of an outer wall, determining the position of a rear embedded part, installing a unit plate adapter, installing a unit plate hanger, adjusting the unit plate in the vertical and horizontal directions, inserting a core into the unit plate and injecting glue, hoisting an upper layer plate, and inspecting the outer wall through a temporary fixing device. The clamping plate can make close contact with the wall, the friction between the clamping plate and the wall can be improved through the anti-skid block, the supporting plate can be stably installed on the wall, use of a rope is facilitated, construction personnel can conveniently work on the outer wall, meanwhile, the wall does not need to be punched, the use difficulty can be reduced, the applicability is improved, and the construction efficiency is improved. Secondary damage to the wall body can be avoided, meanwhile, dismounting, mounting and using are convenient, constructors can conveniently adjust the distance between the rope and the outer wall body by controlling extension and shortening of the electric telescopic rod, and construction of the constructors can be facilitated.
本发明公开了一种建筑单元板块外墙施工工艺,包括将外墙的表面清理干净、确定后置埋件位置、单元板块转接件安装、单元板块吊安装、单元板块垂直水平方向调整、单元板块插芯注胶、上层板块吊装、通过临时固定装置,对外墙进行检验。本发明能够使夹持板与墙体紧密接触,且防滑块能够提高夹持板与墙体之间的摩擦,能够使支撑板稳定安装在墙体上,有利于绳子的使用,方便施工人员在外墙作业,同时本方案不用对墙体进行打孔,能够降低使用难度,提高适用性,能够避免墙体二次受损,同时方便拆卸与安装,方便使用,通过控制电动伸缩杆的伸长与缩短,方便施工人员调节绳子距离外墙墙体之间的距离,能够方便施工人员施工。
Building unit plate outer wall construction process
一种建筑单元板块外墙施工工艺
2024-01-30
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Outer wall vacuum plate and vacuum plate construction process
European Patent Office | 2024
|Aluminum plate curtain wall building outer wall decoration engineering construction method
European Patent Office | 2021
|