A platform for research: civil engineering, architecture and urbanism
Novel pile foundation and concrete pouring jacket comprehensive construction method
The invention provides a novel pile foundation and concrete pouring jacket comprehensive construction method, and belongs to the technical field of concrete reinforcement. The novel pile foundation and concrete pouring jacket comprehensive construction method comprises the following steps that S1, an operator aligns and places equipment at a pile foundation construction position, and a motor is started to drive a closing assembly to close a movable sleeve; s2, a motor drives the lifting assembly to place the movable sleeve to the pile foundation construction position, and when the lifting assembly is driven to place the movable sleeve, the fixed supporting assembly is driven to conduct auxiliary supporting on the movable sleeve; and S3, an operator pours concrete into the movable sleeve, and after the concrete pile foundation is formed and solidified, the motor is reversely driven to dismantle the movable sleeve. By arranging the closing assembly, damage to the concrete surface caused by long-time sliding of the movable sleeve and the concrete surface is avoided, the horizontal precision when the movable sleeve is placed is guaranteed by arranging the fixed supporting assembly, and the machining precision when concrete is poured is guaranteed.
本发明提供一种新型桩基与混凝土套箱综合施工方法,属于混凝土加固技术领域;该新型桩基与混凝土套箱综合施工方法包括如下步骤:S1:操作人员将设备对准放置在桩基施工处,启动电机驱动闭合组件对活动套筒闭合;S2:电机驱动提升组件将活动套筒放置到桩基施工处,在驱动提升组件将活动套筒放置时,带动固定支撑组件对活动套筒实施辅助支撑;S3:操作人员向活动套筒内灌注混凝土,在混凝土桩基成型凝固之后,反向驱动电机对活动套筒进行拆除。本发明通过设置闭合组件,避免活动套筒与混凝土表面长时间滑动对混凝土表面造成破坏,设置固定支撑组件保证活动套筒放置时的水平精度,保证混凝土灌注时的加工精度。
Novel pile foundation and concrete pouring jacket comprehensive construction method
The invention provides a novel pile foundation and concrete pouring jacket comprehensive construction method, and belongs to the technical field of concrete reinforcement. The novel pile foundation and concrete pouring jacket comprehensive construction method comprises the following steps that S1, an operator aligns and places equipment at a pile foundation construction position, and a motor is started to drive a closing assembly to close a movable sleeve; s2, a motor drives the lifting assembly to place the movable sleeve to the pile foundation construction position, and when the lifting assembly is driven to place the movable sleeve, the fixed supporting assembly is driven to conduct auxiliary supporting on the movable sleeve; and S3, an operator pours concrete into the movable sleeve, and after the concrete pile foundation is formed and solidified, the motor is reversely driven to dismantle the movable sleeve. By arranging the closing assembly, damage to the concrete surface caused by long-time sliding of the movable sleeve and the concrete surface is avoided, the horizontal precision when the movable sleeve is placed is guaranteed by arranging the fixed supporting assembly, and the machining precision when concrete is poured is guaranteed.
本发明提供一种新型桩基与混凝土套箱综合施工方法,属于混凝土加固技术领域;该新型桩基与混凝土套箱综合施工方法包括如下步骤:S1:操作人员将设备对准放置在桩基施工处,启动电机驱动闭合组件对活动套筒闭合;S2:电机驱动提升组件将活动套筒放置到桩基施工处,在驱动提升组件将活动套筒放置时,带动固定支撑组件对活动套筒实施辅助支撑;S3:操作人员向活动套筒内灌注混凝土,在混凝土桩基成型凝固之后,反向驱动电机对活动套筒进行拆除。本发明通过设置闭合组件,避免活动套筒与混凝土表面长时间滑动对混凝土表面造成破坏,设置固定支撑组件保证活动套筒放置时的水平精度,保证混凝土灌注时的加工精度。
Novel pile foundation and concrete pouring jacket comprehensive construction method
一种新型桩基与混凝土套箱综合施工方法
ZHANG YAQING (author) / XU TAO (author) / YANG HUA (author) / HU JIANYUN (author) / TANG PENGBO (author) / JIANG DAHAI (author) / YANG LIYE (author) / CHE BIN (author) / NING LIHANG (author) / LIU JIANSHE (author)
2024-02-02
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Concrete pouring device for pile foundation construction
European Patent Office | 2022
|Concrete pouring equipment for foundation pile construction
European Patent Office | 2024
|Concrete pouring enclosure device for pile foundation construction
European Patent Office | 2021
|